Construction Scheduling
- Contract Time Determination (CTD) Scheduling
- CD-2007-11 (Contract Time Determination CD) (pdf)
- FHWA CTD Guidelines (pdf)
- VDOT CTD Guidelines (pdf)
- VDOT CTD Bar-chart Template (Excel Spreadsheet)
- VDOT Production Rates (Excel Spreadsheet)
- Other DOT Production Rate Averages (Excel Spreadsheet)
- Duralator (Excel Spreadsheet)
- Post-award Construction Scheduling
- CD-2008-14 (Cat I & II Progress Schedule Specifications) (pdf)
- Cat M Special Provision for Schedule of Operations (pdf)
- Cat I Special Provision for Progress Schedule (pdf)
- Cat II Special Provision for Progress Schedule (pdf)
- Cat III Special Provision for Progress Schedule (pdf)
- Cat IV Special Provision for Progress Schedule (pdf)
- VDOT P6 Standard Bid Item Resources (VDOTBIDITEMRES_ver.5.0.xer)
- VDOT P6 Standard Bid Item Resources (VDOTBIDITEMRES_ver.6.0.xer) - Zip File
- VDOT P6 Standard Bid Item Resources (VDOTBIDITEMRES_ver.6.1.xer) - Zip File
- VDOT P6 Standard Bid Item Resources (VDOTBIDITEMRES_ver.6.2.1xer) - Zip File
- VDOT P6 Standard Bid Item Resources (VDOTBIDITEMRES_ver.6.7.xer)
- Form C-13C Contractor’s Progress Earnings Schedule (VDOT Form C-13C for Cat I & II) (Excel Spreadsheet) (1/12/12)
- Primavera (P6) Activity Cost-loading Report (ACR) (P6 ACR Export Report File "ACR.erp")
- Form C-13CPM Contractor’s Progress Earnings Schedule (VDOT Form C-13CPM for Cat III & Up) (Excel Spreadsheet)
- Primavera (P6) Monthly Progress Earnings Schedule Report (P6 Export Report File "C-13CPM.erp")
- Form C-13COM Contractor’s Commodity Progress Schedule S-curve (Cat IV) (Excel Spreadsheet)
- Cat I Progress Schedule Review Checklist (Word Document)
- Cat II Progress Schedule Review Checklist (Word Document)
- Cat III Progress Schedule Review Checklist (Word Document)
- Cat IV Progress Schedule Review Checklist (Word Document)
- Project Category (pdf)
- Construction Scheduling Reference Materials
- VDOT Post-award Scheduling Guide (pdf)
VDOT-VT Partnership for Project Scheduling- A Review of State DOT Methods for Determining Contract Times
- Analysis of VDOT Contract Values and Times
- Dura-Lator: A Project Duration Calculator - (updated 5/31/11)
- Management Principles of Scheduling
- A Review of the Operational and Contract Administration Implications of Schedule Response
- Schedule Submittal Requirements
- Schedule Impact Analysis Using CPM Schedules
- Management Principles of Schedule Impact Analysis
- Development of an Intellectual Framework for Schedule Control
- Required Performance Method of Schedule Control
- Implementing Change in a Public Agency: Applying a Process to Produce Change in VDOT
- Contract Time Determination Guidelines
- Tracking Project Commodities for Progress Control
- AACE International Recommended Practice No. 14R-90 – Responsibility and Required Skills for a Project Planning and Scheduling Professional
- AACE International Recommended Practice 29-R03 – Forensic Schedule Analysis (update 5/16/11)
- AACE International Recommended Practice No. 52R-06 – Time Impact Analysis – As Applied in Construction
- Overview of VDOT Progress Schedule Specifications Presentation Slides (pdf)
- Guidelines for Conducting a Scheduling Conference (pdf)
- Guidelines for preparing the VDOT Form C-13C (pdf) NEW
- Guidelines for preparing the VDOT Form C-13CPM (pdf)
- Sample Activity Cost-loading Report (ACR) (pdf)
- Sample Contractor’s Progress Earnings Schedule - Cat I & II (Form C-13C) (pdf)
- Sample Contractor’s Progress Earnings Schedule - Cat III (Form C-13CPM) (pdf)
- FHWA Improvement Type Codes
- VDOT Post-award Scheduling Guide (pdf)
- Construction Scheduling Reference Materials
-