Construction Scheduling
- Contract Time Determination (CTD) Scheduling
- CD-2007-11 (Contract Time Determination CD) (pdf)
- FHWA CTD Guidelines (pdf)
- VDOT CTD Guidelines (pdf)
- VDOT CTD Bar-chart Template (Excel Spreadsheet)
- VDOT Production Rates (Excel Spreadsheet)
- Other DOT Production Rate Averages (Excel Spreadsheet)
- Duralator (Excel Spreadsheet)
- Post-award Construction Scheduling
- VDOT Post-award Scheduling Guide (pdf) (DRAFT)
- Guidelines for Accessing and Using the VDOT Scheduling Application (Not available at this time)
- Project Category (pdf) (Revised 5/31/12)
- CD-2008-14 (Cat I & II Progress Schedule Specifications) (pdf)
- Cat M Special Provision for Schedule of Operations (pdf)
- Cat I Special Provision for Progress Schedule (pdf)
- Cat II Special Provision for Progress Schedule (pdf)
- Cat III Special Provision for Progress Schedule (pdf)
- Cat IV Special Provision for Progress Schedule (pdf)
- Guidelines for Conducting a Scheduling Conference (pdf)
- VDOT P6 Standard Bid Item Resources (ver.7.0.xer)
- Form C-13C Contractor’s Progress Earnings Schedule (Excel Spreadsheet) (1/12/12)
- Guidelines for preparing the VDOT Form C-13C (pdf)
- Form C-13CPM Contractor’s Progress Earnings Schedule (Excel Spreadsheet)
- Guidelines for preparing the VDOT Form C-13CPM (pdf) NEW
- Primavera (P6) Activity Cost-loading Report (ACR) (P6 ACR Report File "ACR.erp")
- Primavera (P6) Form C-13CPM Monthly Progress Earnings Schedule Data Export Report - update 1/17/13
- Form C-13COM Contractor’s Commodity Progress Report S-curve (Excel Spreadsheet)
- Cat I Progress Schedule Review Checklist (Word Document)
- Cat II Progress Schedule Review Checklist (Word Document)
- Cat III Progress Schedule Review Checklist (Word Document)
- Cat IV Progress Schedule Review Checklist (Word Document)
- Overview of VDOT Progress Schedule Specifications Presentation Slides (pdf)
- VDOT-VT Partnership for Project Scheduling
- A Review of State DOT Methods for Determining Contract Times
- Analysis of VDOT Contract Values and Times
- Dura-Lator: A Project Duration Calculator - (updated 5/31/11)
- Management Principles of Scheduling
- A Review of the Operational and Contract Administration Implications of Schedule Response
- Schedule Submittal Requirements
- Schedule Impact Analysis Using CPM Schedules
- Management Principles of Schedule Impact Analysis
- Development of an Intellectual Framework for Schedule Control
- Required Performance Method of Schedule Control
- Implementing Change in a Public Agency: Applying a Process to Produce Change in VDOT
- Contract Time Determination Guidelines
- Tracking Project Commodities for Progress Control
- Other Construction Scheduling Reference Materials and Websites
- Link to VDOT Primavera Portal on LoadSpring
- Link to Oracle-Primavera Support
- Link to Project Management Institute (PMI) website
- Link to Association for the Advancement of Cost Engineering (AACE) website
- Loadspring Primavera P6 Access Instructions - rev. 3/2013
- AACE International Recommended Practices - 4/11/13
- FHWA Improvement Type Codes
-