Construction Directive Memoranda 2007-10

CONSTRUCTION DIRECTIVE MEMORANDA

 

2011 - 2014 | 2007 - 2010 | 2003 - 2006 | 1999 - 2002 | 1997 - 1998

2010

 

CD No. Date Title Status
CD-2010-01 3/23/10 Contract Change Management:
Work Orders, Force Accounts, Contract Expenditures
Active
             

 

2011 - 2014 | 2007 - 2010 | 2003 - 2006 | 1999 - 2002 | 1997 - 1998

2009

 

CD No. Date Title Status
CD-2009-01 5/27/09 Maintenance of Traffic on Construction Projects:
Work Zone Traffic Control (WZTC) Coordinator
Active
CD-2009-02 5/15/09

Field Change Documentation:  Documentation of Field Changes

CD-2009-2 that was issued on May 15, 2009 contained some references to design engineer and construction engineer "of record". It was the intent that all reference to the term "of record" be deleted from this CD. Please find attached a corrected copy of this CD as it will be posted on the web.

Active
CD-2009-03 5/15/09 Professional Licensure and Sealing and Signing of Plans:  Requirement for Sealing No-Plan Assemblies for Advertisement Active
             


 

2011 - 2014 | 2007 - 2010 | 2003 - 2006 | 1999 - 2002 | 1997 - 1998
 

 

2008

CD No. Date Title Status
CD-2008-01 1/2/2008 2007 Road and Bridge Specifications:  Distribution and Instructions for Use Active
CD-2008-02 1/24/2008 Inspection Manual:  Distribution Active
CD-2008-03 3/10/08 Eliminated Items:  Guidelines for Elimination of Contract Items and Materials Active
CD-2008-04 3/13/08 Construction Safety:  Memoradum of Understanding:  Virginia Occupational Safety and Health Active
CD-2008-05 3/13/08 Maintenance of Traffic:  Construction Pavement Markings Active
CD-2008-06 3/13/08 Vertical Clearances:  Temporary Reduction in Vertical Clearances Active
CD-2008-07 3/13/08 Environmental and Safety Responsibility:  Improving Compliance with Environmental and Safety Laws Active
CD-2008-08 3/13/08 Maintenance of Traffic:  Reusing Pavement Marking Tape Active
CD-2008-09 3/13/08 Supply and Quality Requirement:  Warranty Coverage Active
CD-2008-10 3/13/08 Non-Payment Claims Against Contractor:  Procedures for Handling Non-Payment Claims Against Contractors Active
CD-2008-11 4/1/08 Pipe Replacement or Rehabilitation Contracts:  Guidelines for Pipe Culvert Replacement or Rehabilitation - Selection Criteria, Specifications, and Inspection Active
CD-2008-12 5/29/08 Subcontracting:  Approval of Sublet Request Active
CD-2008-13 6/2/08 Construction Engineering and Inspection (CEI):  FMS-II Phase 9104 (Construction) Activity Codes Active
CD-2008-14 7/18/08 Scheduling Specifications for Category M, I, & II Projects:
Special Provisions for Schedule of Operations for Category M Projects and for Progress Schedule for Category I & II Projects
Active
CD-2008-15 12/18/08 Construction Division and/or Directive Memoranda:  Sunsetting of Memoranda dated January 1, 2005 and earlier Active


2011 - 2014 | 2007 - 2010 | 2003 - 2006 | 1999 - 2002 | 1997 - 1998

2007

CD No. Date Title Status
 CD-2007-01 1/18/07 Materials on Hand:  Guidelines for Inventory of Items Paid for as Material on Hand Active
CD-2007-02 Reissued
4/2/07
Section 514 Field Offices:  Network Connectivity for Field Offices Active
CD-2007-03 Reissued
7/3/07
"No Plan" RAAP Process:
New "No Plan" RAAP Process
Active
CD-2007-04 7/24/07 Contractor's Performance Evaluation:  Completion, Submittal and Appeals Process Active
CD-2007-05 7/26/07 Final Acceptance Letter:  DBE Goals and SWAM Potential Achievements Active
CD-2007-06 7/26/07 Utilization of Disadvantaged Business Enterprises and Small Women and Minority Firms Active
 CD-2007-07 9/10/07  Maintenance of Traffic:  Guidelines for the Use of Lump Sum Maintenance of Traffic Promotion Active
 CD-2007-08 9/17/07 Post-Award Schedule management:  Policy and Guidelines for the Use of the Special Provision for Progress Schedule from Category I Projects Superseded
CD-2008-14
 CD-2007-09 10/8/07 Project Showing:  Guidelines for Project Showings Active
 CD-2007-10 10/8/07 Form C-10 for Work Orders:  Completion of Form C-10 Active
 CD-2007-11 12/27/08 Pre-Advertisement Construction Schedule Developement:  Guidelines for Preparing and Submitting the Contract Time Determination Report (CTDR) Active

 

 