A site plan permit is required for work shown on an Arlington County Site Plan or work shown on a Fairfax County SP, SD, PI, MSP or RGP Plan. These plans require approval from the appropriate county and recommendation for approval by VDOT.
NOTE: Good right-of-way management principles dictate that all site plans permits issued in the VDOT right-of-way be monitored on a regular basis. Inspectors monitor sites for proper erosion and siltation control, safety issues, and work affecting the right-of-way.
Permit Application Process
- Obtain county approval
- Submit surety estimate to VDOT Fairfax Permits for review
-
- One complete set of plans
- Email address of owner and engineer must be included
- Work in VDOT Right-Of-Way to be colored per Site Plan Permit Guidelines
- Completed Bond Estimate Worksheet (Site Plans) stamped by the engineer of record
-
Helpful Information
- Surety must be posted by the property owner
- All plans must be approved by the appropriate county
- Proof of county approval must be submitted as part of the permit package and varies by plan
-
- Fairfax County SP, SD, PI
Entrance Correct Stamp on Plan cover sheet - Fairfax County MSP, RGP
Printout from Fairfax County showing approval - Arlington County Site Plans
Complete Signature Block on Plan cover sheet
- Fairfax County SP, SD, PI
-
- Completed automated data disks for all site plan permits (APAS)
- Geographic information Systems (GIS) - Download GIS Data
- CD with electronic files in Group 4 TIFF format for the complete site
- Some Site Plan Permits will require the submittal of an "Initial Street Acceptance package" after June 6, 2005.
- See Requirements for All Site Plan Permits