Design-Build Request for Proposals

The current RFPs are listed below with a short description and the due date. Design-build proposals must be received by the date and time according to the selected RFP.

Please review the criteria prior to submittal to ensure that your firm receives equal consideration in the evaluation. For more information on the RFP process see the individual RFP.

In order to display and print the RFPs, the Adobe Reader software (version 3.0 or later) must be present on your system. If you do not have a copy installed on your computer, you will need to download and configure the free software here before working with these files.

This is a one-time process which will then permit you to view and print these and other PDF files from the Web. Please follow the installation and browser configuration instructions.

 

Route 29 Bridge Over Little Rocky Run

Location:  The project is located in Fairfax County, Virginia.

Description: Furnish a proposal for the:

  • Roadway design
  • Structure design
  • Quality assurance and quality control
  • Construction management
  • Right-of-way acquisition
  • Environmental compliance
  • Utility relocations and design

 

The Design-Build project includes design, construction, and overall project management for the Route 29 Bridge Replacement over Little Rocky Run in Fairfax County.

Deadline:  April 4, 2013 (4 p.m. prevailing local time).

Project Information Meeting:  A project information meeting will be held on March 1, 2013 for potential Offerors at the Northern Virginia District Office of the Virginia Department of Transportation, 4975 Alliance Drive, Fairfax, VA 22030 in the AccotinkConference Room (1st Floor) at 10 a.m. (prevailing local time). 

Update: The Price Proposals will be opened publically on Monday, April 8, 2013.

PDFs  pdfs

RFP Part 2 – Addendum No. 1 
Attachment 2.2 – Minimum Roadway Design Criteria Table 
RFP Questions and Answers - Revised March 28, 2013
Pre-Proposal Meeting Presentation 
Pre-Proposal Meeting Attendance List 
Approved Bridge Design Waiver 
RFP (Part 1, Part 1 Attachments, Part 2, Part 2 Attachments, Exhibit 1 to Part 3, Part 3 Attachments, Part 4 Attachments and Part 5 Attachments)
RFP Attachment 2.6 – RFP Information Package Order Form
RFP Attachment 3.4 – Form C-78-RFP - Addendum No. 1 
RFP Attachment 4.2.2a – Certification Regarding Debarment Primary Covered Transactions
RFP Attachment 4.2.2b – Certification Regarding Debarment Lower Tier Covered Transactions

Word  Word

RFP Attachment 4.0.1.1 – Letter of Submittal Checklist
RFP Attachment 4.0.1.2 – Price Proposal Checklist
RFP Attachment 4.2.5 – SCC and DPOR Information - Businesses
RFP Attachment 4.2.6(a) – Work History Form – Lead Contractor
RFP Attachment 4.2.6(b) – Work History Form – Lead Designer
RFP Attachment 4.4.2 – Key Personnel Resume Form
RFP Attachment 4.4.3 – SCC and DPOR Information - Individuals

Revisions to RFP Information Package

The three newest DGN files are available upon request by contacting Joe Clarke P.E

Route 29 / Charlottesville Bypass

Location: The project is located in Albemarle County.

Additional information:

Description: Furnish a Qualifications Submittal for the:

  • Design
  • Environmental permits
  • Right-of-way acquisition
  • Utility relocations
  • Construction
  • Structures
  • Quality assurance and quality control

for design and construction and overall project management for the Route 29 / Charlottesville Bypass, Albemarle County.

Deadline:  Nov. 29, 2011 (4 p.m. prevailing local time).

Project information meeting:  A project information meeting and utility scoping meeting will be held Oct.6, 2011, for potential offerors at the Culpeper District Office of the Virginia Department of Transportation, located at 1601 Orange Road, Culpeper, VA, 22701, in the district auditorium beginning at 9 a.m. (prevailing local time). 

VDOT has determined that the Offerors listed below have submitted a responsive Qualifications Submittal for the Route 29/Charlottesville Bypass Project.  Each Offeror who has submitted a responsive Qualifications Submittal will be permitted to submit a Proposal for the Project, due on April 17, 2012. 

The Proposal will consist generally of a Letter of Submittal, Attachments to the Letter of Submittal, and the Price Proposal.  

American Infrastructure/ Kimley-Horn
CH2MHILL
Charlottesville Bypass Constructors (Shirley-English)/ Dewberry
CK Constructors (Corman-Kiewit)/ Jansen and Spaans
Granite-Wagman/ Gannett Fleming
Lane/ RK&K
Skanska-Branch/ JMT
United Infrastructure/ T.Y. Lin
Zachry/ TranSystems

PDFs  pdfs

 

 Word  Word

RFP Addendum Number One Word Document Attachments 

RFP attachment 4.1.2              (Rev. Nov. 18, 2011)
RFP attachment 4.1.3              (Rev. Nov. 18, 2011)
RFP attachment 4.6.1              (Rev. Nov. 18, 2011)


RFP attachment 4.3.1.5(a)
RFP attachment 4.3.1.5(b)
RFP attachment 4.3.1.6
 

ZIP Files

 

Page last modified: March 29, 2013