Design-Build Request for Qualifications (RFQs)

The current RFQs are listed with a short description and the due date. Statements of Qualifications must be received by the date and time according to the selected RFQ.

Review the criteria prior to submittal to ensure that your firm receives equal consideration in the evaluation. For more information on the RFQ process, see the individual RFQ.

Monitor this page for potential updates.

Route 7 Corridor Improvements

Project overview: The project is located on Route 7 (Leesburg Pike) just west of the Route 7/Dulles Toll Road interchange in Fairfax County. 

The project includes widening of about a 6.8 mile segment of Route 7 from four to six lanes between Jarrett Valley Drive and Reston Avenue. 

The purpose of the project is to increase capacity, improve traffic operations and reduce congestion, improve community access at intersections and via frontage roads and improve safety in corridor. 

Project improvements include: an additional eastbound and westbound lane, shared use paths on both sides of Route 7, replacement of the existing Route 7 bridge over Difficult Run, stream relocation, a new pedestrian tunnel under Route 7 accessing the Colvin Run Mill, a grade-separated intersection for eastbound Route 7 at Baron Cameron Avenue, asphalt overlay of existing pavements, new sound barriers and installation of storm drain pipes and stormwater management facilities. 

The design-builder will also be responsible for coordinating the Route 7 Widening Project with the Washington Gas transmission line upgrade project within the project limits. 

Description: Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structures and bridges
  • Environmental
  • Geotechnical
  • Hydraulics
  • Right of way acquisition
  • Stream relocation
  • Utility relocation and coordination
  • Public involvement / communications
  • Construction
  • Quality assurance and quality control

Deadline: Sept. 21, 2017 (4 p.m. prevailing local time).

Project information meeting: A project information meeting will be held on Aug. 23, 2017, for potential offerors at the Northern Virginia (NOVA) District of the Virginia Department of Transportation, in the Potomac Conference Room, at 4975 Alliance Drive, Fairfax, Virginia, 22030 at 1 p.m. (prevailing local time). 

RFQ Addendum No. 1

Request for Qualifications (RFQ) – Addendum No. 1
RFQ Attachment 2.10 – Form C-78-RFQ – Addendum No. 1

PDFs pdfs

RFQ Questions and Answers
Project Information Meeting presentation
Project Information Meeting attendance list
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 3.2.7(a) – Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) – Certification regarding debarment lower tier covered transactions
RFQ Attachment 4.1.2 – Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies
RFQ Attachment 3.2.10 – SCC and DPOR information table
RFQ Attachment 3.3.1 – Key personnel resume form
RFQ Attachment 3.4.1(a) – Work history form – lead contractor
RFQ Attachment 3.4.1(b) – Work history form – lead designer

Zip Files

RFQ Conceptual Bridge Plans

I-81 Bridge Replacement at Exit 114

Description: The project is located in Montgomery County / town of Christiansburg.

The project begins approximately 0.381 miles south of the Christiansburg southern corporate limits and ends 0.510 miles north of the Christiansburg southern corporate limits.

The primary purpose of this project is to replace the two structurally deficient Interstate 81 bridges over Route 8, which were constructed in 1964.

The project also includes realignment of I-81, raising the grade at the bridges and approaches and the modification of the Exit 114 ramps.

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Traffic control devices
  • Transportation management plan
  • Right of way
  • Utilities
  • Public involvement / relations
  • Quality assurance and quality control
  • Intelligent Transportation Systems
  • Construction engineering and inspection
  • Overall project management

Deadline: Sept. 6, 2017 (4 p.m. prevailing local time).

Project information meeting:  A project information meeting was held July 25, 2017, for potential offerors at the Montgomery County Government Center, 755 Roanoke St., Christiansburg, Virginia, 24073-3181 at 9 a.m. (prevailing local time) in Multi-Purpose Room #2.  

RFQ Addendum No. 1 - Aug. 23, 2017

Request for Qualifications (RFQ) - Addendum No. 1  
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 1

PDFs pdfs

RFQ questions and answers
Project information meeting presentation   
Project information meeting attendance list
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 2.10 – Form C-78 RFQ
RFQ Attachment 3.2.7(a) – Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) – Certification regarding debarment lower tier covered transactions
RFQ Attachment 4.1.2 – Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies
RFQ Attachment 3.2.10 – SCC and DPOR information table
RFQ Attachment 3.3.1 – Key personnel resume form
RFQ Attachment 3.4.1(a) – Work history form – lead contractor 
RFQ Attachment 3.4.1(b) – Work history form – lead designer

Warrenton Southern Interchange Route 15 / 17 / 29

Description: This project will implement a grade-separated interchange where Routes 15 / 17 / 29 intersects Business Routes 15 / 17 / 29 to the west and Lord Fairfax Road to the east. 

The project, located in Fauquier County, extends along Routes 15 / 17 / 29 from Route 744 (Lovers Lane) to 0.8 miles north of the intersection.

This project will also include a new Park-and-Ride lot, landscaping and pedestrian and cycling facilities.

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Traffic control devices
  • Transportation management plan
  • Right of way
  • Utilities
  • Sign structures
  • Lighting and landscaping
  • Public relations
  • Quality assurance and quality control
  • Construction
  • Overall project management

Deadline: June 2, 2017 (4 p.m. prevailing local time).

Project information meeting:  A project information meeting was held May 5, 2017, for potential offerors at the Culpeper District Office of the Virginia Department of Transporatation, 1601 Orange Road, Culpeper, Virginia, 22701 in the district auditorium at 10 a.m. (prevailing local time).

RFQ Addendum No. 1 - May 22, 2017

Request for Qualifications (RFQ) - Addendum No. 1  
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 1

PDFs pdfs

RFQ questions and answers
Project information meeting presentation   
Project information meeting attendance list
Request for Qualifications, April 26, 2017
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 2.10 – Form C-78 RFQ
RFQ Attachment 3.2.7(a) – Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) – Certification regarding debarment lower tier covered transactions
RFQ Attachment 4.1.2 – Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies
RFQ Attachment 3.2.10 – SCC and DPOR information table
RFQ Attachment 3.3.1 – Key personnel resume form
RFQ Attachment 3.4.1(a) – Work history form – lead contractor
RFQ Attachment 3.4.1(b) – Work history form – lead designer

I-64 Capacity Improvements - Segment III

Description: The project is located on Interstate 64 from 1.15 miles west of Route 199 (Lightfoot) to 1.05 miles west of Route 199 (Humelsine Parkway/Marquis Center Parkway) and will extend the three-lane section from the point where the I-64 Segment II project ends to the west for approximately 8.2 miles.

Widening of the roadway and bridges is expected to occur mostly in the median of the existing interstate, limiting the amount of right of way required to construct the project, avoiding impacts to existing interchanges and minimizing impacts to right of way, utility and environmental assets.

The proposed improvements include: full-depth reconstruction of the existing travel lanes and outside shoulder, the addition of one 12-foot-wide travel lane and one 12-foot-wide paved shoulder in each direction, lengthening of acceleration and deceleration lanes, reconstruction and signalization of I-64 eastbound off ramp to Route 143, repair and widening of four mainline bridges, replacement of the existing I-64 bridges over Queens Creek and repair / extension of three major box culverts located within the project limits.

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Soundwalls
  • Right of way
  • Utilities
  • Sign structures
  • ITS devices
  • Public relations
  • Quality assurance and quality control
  • Construction
  • Overall project management

Deadline: May 2, 2017 (4 p.m. prevailing local time).

Project information meeting:  A project information meeting was held April 5, 2017, for potential offerors at the Hampton Roads Convention Center, 1610 Coliseum Drive, Hampton, Virginia, in the Second Floor Conference Room (Room 202) at 9 a.m. (prevailing local time).

PDFs pdfs

RFQ questions and answers
Project information meeting presentation   
Project information meeting attendance list
Request for Qualifications, March 29, 2017
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 2.10 – Form C-78 RFQ
RFQ Attachment 3.2.7(a) – Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) – Certification regarding debarment lower tier covered transactions
RFQ Attachment 4.1.2 – Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies
RFQ Attachment 3.2.10 – SCC and DPOR information table
RFQ Attachment 3.3.1 – Key personnel resume form
RFQ Attachment 3.4.1(a) – Work history form – lead contractor
RFQ Attachment 3.4.1(b) – Work history form – lead designer

I-66 Eastbound Widening Inside the Beltway

Description: The project involves widening approximately four miles of eastbound Interstate 66 between the Dulles Connector Road (Route 267) in Fairfax County and Fairfax Drive (Route 237) in the Ballston area of Arlington County.  

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and bridge
  • Soundwalls
  • Environmental
  • Geotechnical
  • Hydraulics
  • Traffic control devices
  • Transportation management
  • Right of way
  • Utilities
  • Public involvement / public relations
  • Quality assurance and quality control
  • Lighting and landscaping
  • Construction engineering and inspection
  • Overall project management

Deadline: Jan. 17, 2017 (4 p.m. prevailing local time).

Project information meeting: A project information meeting was held Wednesday Nov. 30, 2016, for potential offerors at the Virginia Department of Transportation’s NOVA District Office Potomac Conference Room, at 4975 Alliance Drive, Fairfax, Virginia, 22030, at 10 a.m. (prevailing local time).

RFQ Addendum No. 1 - Dec. 16, 2016

Request for Qualifications (RFQ) - Addendum No. 1 
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 1 

PDFs pdfs

RFQ questions and answers 
Project information meeting presentation  
Project information meeting attendance list 
Request for Qualifications (RFQ)
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 3.2.7(a) - Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) - Certification regarding debarment lower tier covered transactions 
RFQ Attachment 4.1.2 - Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies
RFQ Attachment 3.2.10 – SCC and DPOR information table
RFQ Attachment 3.3.1 – Key personnel resume form, revised Dec. 21, 2016 
RFQ Attachment 3.4.1(a) – Work history form – lead contractor
RFQ Attachment 3.4.1(b) – Work history form – lead designer

I-95 Southbound Collector-Distributor Lanes – Rappahannock River Crossing

Description: The project is located along Interstate 95 between mile markers 134 and 130 in the city of Fredericksburg and Stafford County.

The project will modify the Route 17 interchange and add collector-distributor lanes parallel to the I-95 southbound general purpose lanes between Exit 133 (Route 17) and Exit 130 (Route 3), along with the construction of a new bridge over the Rappahannock River. 

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Soundwalls
  • Right of way
  • Utilities
  • Sign structures
  • ITS devices
  • Public relations
  • Quality assurance and quality control
  • Construction engineering and inspection
  • Overall project management

Deadline: TBD (4 p.m. prevailing local time).

Project information meeting: A project information meeting was held Wednesday, Nov. 9, 2016, for potential offerors at the Virginia Department of Transportation’s Fredericksburg District Office Auditorium at 86 Deacon Road, Fredericksburg, Virginia, 22405, at 2 p.m. (prevailing local time).

Project update memorandum (Memorandum pdfs ) (Revised memorandum pdfs )

RFQ Addendum No. 2 - Jan. 23, 2017

Request for Qualifications (RFQ) - Addendum No. 2 
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 2
RFQ questions and answers, revised Jan. 23, 2017

RFQ Addendum No. 1 - Dec. 19, 2016

Request for Qualifications (RFQ) - Addendum No. 1 
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 1 
RFQ Attachment 3.2.10 – SCC and DPOR information table 
RFQ Attachment 3.3.1 – Key personnel resume form

RFQ Information Package - Addendum No. 1 

RFQ Information Package Addendum No. 1, Dec. 19, 2016

PDFs pdfs

Project information meeting presentation 
Project information meeting attendance list 
Request for Qualifications (RFQ)
RFQ Attachment 2.8 – RFQ information package order form
RFQ Attachment 3.2.7(a) - Certification regarding debarment primary covered transactions 
RFQ Attachment 3.2.7(b) - Certification regarding debarment lower tier covered transactions 
RFQ Attachment 4.1.2 - Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 – SOQ checklist
RFQ Attachment 3.2.6 – Affiliated and subsidiary companies

RFQ Attachment 3.4.1(a) – Work history form – lead contractor
RFQ Attachment 3.4.1(b) – Work history form – lead designer

 

I-64 Southside Widening and High Rise Bridge, Phase I

Description: The project is located on Interstate 64 in the city of Chesapeake, beginning near Rotunda Avenue approximately 0.6 miles east of the I-264 interchange at Bowers Hill, and ending approximately 0.9 miles east of the I-464 interchange.  

The project includes widening of the existing interstate from four lanes to six lanes from the point east of the I-264 interchange where the existing lanes reduce from six lanes to four lanes, to the point near I-464 where the existing lanes increase from four lanes to six lanes.  

The widening will accommodate two general purpose lanes and one managed lane in each direction.  

The proposed improvements include:

  • A new fixed-span High Rise bridge south of the existing bridge, with 100-foot vertical clearance over the Elizabeth River
  • Realignment of the existing I-64 lanes immediately adjacent to the new High Rise bridge
  • Sound barrier walls
  • Asphalt overlay over the existing pavement
  • The addition of new asphalt or concrete 12-foot-wide travel lanes with four-foot buffers and shoulders west of the High Rise Bridge
  • The addition of new asphalt 12-foot-wide travel lanes with four-foot buffers and shoulders east of the High Rise Bridge
  • Replacement of the overpass bridge at Great Bridge Boulevard with a parallel bridge and associated realignment of Great Bridge Boulevard
  • Widening of six existing I-64 bridges over Military Highway, Yadkin Road and Shell Road
  • Extension of two box culverts and 14 pipe culverts
  • Installation of storm drain pipes and stormwater management facilities
  • Civil infrastructure for the new managed lanes

Widening of the existing roadway and bridges is expected to occur in the median of the existing interstate, avoiding impacts to existing interchanges and minimizing impacts to right of way.

The scope of work for the managed lanes will include the civil infrastructure only such as gantries and signs and will exclude the integration system. The integration system will be provided by others as part of a separate project.

Furnish Statement of Qualifications to support the design and construction of the project to include, but not be limited to, the following:

  • Interstate widening
  • Roadway
  • Survey
  • Right of way
  • Utilities
  • Structures and  bridges
  • Demolition of structures
  • Civil infrastructure for managed lanes, excluding integration system
  • Reconfiguration of barrier gates and lane markings for existing High Rise Bridge
  • Permitting
  • Coast Guard coordination, including permitting
  • Navigable channel fender system
  • Geotechnical
  • Hydraulics
  • Storm drainage and storm water management facilities
  • Installation of tide gate
  • Pavement reconstruction, pavement overlay and new pavement
  • Intelligent Transportation Systems for monitoring traffic conditions and safety
  • Railroad coordination
  • Guardrail
  • Retaining walls
  • Sound barrier walls
  • Traffic control devices
  • Signs, sign structures and foundations
  • Roadway and marine navigation lighting
  • Transportation management plan
  • Traffic maintenance and management during all phases of construction
  • Landscaping
  • Public involvement / relations
  • Quality assurance and quality control
  • Construction engineering and inspection
  • Overall project management.  

Deadline: Oct. 13, 2016 (4 p.m. prevailing local time).

Note: Deadline revised to Oct. 13, 2016

Project information meeting: A project information meeting was held Aug. 25, 2016, for potential offerors at the Hampton Road District Office of the Virginia Department of Transportation, 1700 N. Main St., Suffolk, Virginia, 23434, in the district auditorium at 1:30 p.m. (prevailing local time).

RFQ Addendum No. 2 - Oct. 4, 2016

Request for Qualifications (RFQ) - Addendum No. 2 
RFQ attachment 2.11 - Form C-78 RFQ - Addendum No. 2
RFQ questions and answers, revised Sept. 30, 2016 

RFQ Addendum No. 1 - Sept. 16, 2016 

Request for Qualifications (RFQ) - Addendum No. 1 
RFQ Attachment 2.11 - Form C-78 RFQ - Addendum No. 1 
RFQ Attachment 3.3.1(a) - Key personnel resume form - Addendum No. 1 
RFQ Attachment 3.5 - Lead contractor safety qualifications - Addendum No. 1

PDFs pdfs

Request for Qualifications (RFQ), Aug. 16, 2016
Project information meeting presentation  
Project information meeting attendance list 
RFQ Attachment 2.9 - RFQ information package order form
RFQ Attachment 2.11 - Form C-78-RFQ (Acknowledgement of revisions)
RFQ Attachment 3.2.7(a) - Certification regarding debarment primary covered transactions
RFQ Attachment 3.2.7(b) - Certification regarding debarment lower tier covered transactions 
RFQ Attachment 4.1.2 - Sample SOQ score sheet

Word Word

RFQ Attachment 3.1.2 - SOQ checklist
RFQ Attachment 3.2.6 - Affiliated and subsidiary companies
RFQ Attachment 3.2.10 - SCC and DPOR information table
RFQ Attachment 3.3.1(a) - Key personnel resume form
RFQ Attachment 3.3.1(b) - Key personnel reference form
RFQ Attachment 3.4.1(a) - Work history form – Lead contractor
RFQ Attachment 3.4.1(b) - Work history form – Subcontractor
RFQ Attachment 3.4.1(c) - Work history form – Lead designer
RFQ Attachment 3.4.1(d) - Work history form – Subconsultant
RFQ Attachment 3.5 - Lead contractor safety qualifications

Additions to the RFQ Information Package

Signed FONSI 
Pavement recommendations report

Page last modified: Sept. 6, 2017