E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1A89216 STATE PROJ NUM: PM1A-052-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(231) ORDER NO. 104 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 639| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 2084| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 54032|TYPE B CLASS I PAVE. | 24435| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0040 | 54042|TYPE B CLASS I PAVE. | 160| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54217|SNOW PLOW. RAISED | 322| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0060 | 54300|PAVEMENT MESSAGE MARK. | 13| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0070 | 54401|PAVE. MESSAGE MARK. | 1| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1B89217 STATE PROJ NUM: PM1B-084-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(232) ORDER NO. 105 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1928| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 4648| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 54032|TYPE B CLASS I PAVE. | 39750| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0040 | 54217|SNOW PLOW. RAISED | 354| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1C89218 STATE PROJ NUM: PM1C-097-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(233) ORDER NO. 106 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 618| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 5559| | |------------|SM-19.0A |---------| | |315 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16350|ASPHALT CONCRETE | 2022| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 14186| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 54032|TYPE B CLASS I PAVE. | 18379| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0060 | 54042|TYPE B CLASS I PAVE. | 32| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54217|SNOW PLOW. RAISED | 230| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0080 | 54404|PAVE. MESSAGE MARK. | 1| | |------------|R/R CROSSING |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1D89219 STATE PROJ NUM: PM1D-025-F09 FEDERAL PROJ NUM:AC-STP-PM01(234) ORDER NO. 107 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- A |0010 | 16325|ASPHALT CONCRETE | 4520| | |------------|SM-19.0A |---------| | |315 | |TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 230| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 27867| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 2020| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54040|TYPE B CLASS I PAVE. | 210| | |------------|LINE MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1E89249 STATE PROJ NUM: PM1E-013-F09, P101 FEDERAL PROJ NUM:NONE ORDER NO. 108 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 348| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 4708| | |------------|SM-19.0A |---------| | |315 | |TON | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1F89250 STATE PROJ NUM: PM1F-083-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(236) ORDER NO. 109 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1702| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 4987| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 54032|TYPE B CLASS I PAVE. | 61900| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0040 | 54217|SNOW PLOW. RAISED | 764| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1G89253 STATE PROJ NUM: PM1G-092-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(237) ORDER NO. 110 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 5239| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 4940| | |------------|SM-19.0A |---------| | |315 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16350|ASPHALT CONCRETE | 11466| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16355|ASPHALT CONCRETE | 1703| | |------------|TY. SM-12.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0050 | 16388|FLEXIBLE PAVEMENT | 98765| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 54032|TYPE B CLASS I PAVE. | 213885| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54037|TYPE B CLASS I PAVE. | 1800| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54040|TYPE B CLASS I PAVE. | 105| | |------------|LINE MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54217|SNOW PLOW. RAISED | 2618| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0100 | 54401|PAVE. MESSAGE MARK. | 2| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1H89254 STATE PROJ NUM: NONE/PM1H-010-F09 FEDERAL PROJ NUM:AC-STP-PM01(238) ORDER NO. 111 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 2248| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 1795| | |------------|SM-19.0A |---------| | |315 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16350|ASPHALT CONCRETE | 5161| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 76628| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54217|SNOW PLOW. RAISED | 992| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1I89255 STATE PROJ NUM: PM1I-098-F09 FEDERAL PROJ NUM:AC-STP-PM01(239) ORDER NO. 112 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 2585| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 8530| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 8096| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 94432| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54217|SNOW PLOW. RAISED | 1148| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0060 | 54401|PAVE. MESSAGE MARK. | 2| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1J89257 STATE PROJ NUM: PM1J-038-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(240) ORDER NO. 113 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1893| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 8869| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 19477| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 71460| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54040|TYPE B CLASS I PAVE. | 170| | |------------|LINE MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0060 | 54042|TYPE B CLASS I PAVE. | 52| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54217|SNOW PLOW. RAISED | 913| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0080 | 54300|PAVEMENT MESSAGE MARK. | 1| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0090 | 54310|PAVEMENT MESSAGE MARK. | 1| | |------------|ELONGATED ARROW DOUBLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0100 | 54401|PAVE. MESSAGE MARK. | 2| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1K89355 STATE PROJ NUM: PM1K-086-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(241) ORDER NO. 114 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 4385| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 13491| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 54032|TYPE B CLASS I PAVE. | 133824| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0040 | 54042|TYPE B CLASS I PAVE. | 62| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54217|SNOW PLOW. RAISED | 1592| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0060 | 54300|PAVEMENT MESSAGE MARK. | 1| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM109PM1L89371 STATE PROJ NUM: PM1L-095-F09, P101 FEDERAL PROJ NUM:AC-STP-PM01(242) ORDER NO. 115 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1162| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 9157| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 54032|TYPE B CLASS I PAVE. | 42240| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0040 | 54217|SNOW PLOW. RAISED | 550| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2A89447 STATE PROJ NUM: PM2A-017-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(228) ORDER NO. 208 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1660| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 10578| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16370|ASPHALT CONCRETE | 782| | |------------|TY. IM-19.0D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 28418| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 1267| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0070 | 54042|TYPE B CLASS I PAVE. | 18| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54049|TYPE B CLASS III PAVE. | 177923| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54106|ERADICATION OF EXIST. | 36| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0100 | 54217|SNOW PLOW. RAISED | 860| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2D89996 STATE PROJ NUM: PM2D-060-F09, P401 FEDERAL PROJ NUM:ASTP-PM02(230) ORDER NO. 209 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1356| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 11553| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 361494| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 16389|FLEXIBLE PAVEMENT EDGE | 5914| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0050 | 16390|ASPHALT CONCRETE | 575| | |------------|TY. BM-25.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0060 | 16395|ASPH. CONC. TY. | 861| | |------------|BM-25.0A (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0070 | 54042|TYPE B CLASS I PAVE. | 196| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54050|TYPE B CLASS III PAVE. | 91422| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54217|SNOW PLOW. RAISED | 435| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0100 | 54300|PAVEMENT MESSAGE MARK. | 2| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2F89444 STATE PROJ NUM: PM2F-044-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(231) ORDER NO. 210 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 2368| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 19731| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16370|ASPHALT CONCRETE | 3949| | |------------|TY. IM-19.0D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 347494| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 27039| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 51615|14/1 ENCLOSED COND. | 6400| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 51911|SAW CUT | 1276| | |------------|3/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0080 | 51911|SAW CUT | 668| | |------------|5/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0100 | 54042|TYPE B CLASS I PAVE. | 750| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54049|TYPE B CLASS III PAVE. | 16712| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0120 | 54050|TYPE B CLASS III PAVE. | 130684| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM2F89444 STATE PROJ NUM: PM2F-044-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(231) ORDER NO. 210 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0130 | 54100|PAVEMENT MARKING | 672| | |------------|ADVANCE WARNING |---------| | |704 |RUMBLE STRIPS |LF | | | | -------------------------------------------------------------------------------- |0140 | 54105|ERADICATION OF EXIST. | 576| | |------------|PAVEMENT MARKING |---------| | |512 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54106|ERADICATION OF EXIST. | 1872| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0160 | 54217|SNOW PLOW. RAISED | 502| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 54300|PAVEMENT MESSAGE MARK. | 16| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 54401|PAVE. MESSAGE MARK. | 1| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2H89445 STATE PROJ NUM: PM2H-033-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(232) ORDER NO. 211 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1343| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 12879| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 174733| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 475| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0060 | 16390|ASPHALT CONCRETE | 4027| | |------------|TY. BM-25.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0070 | 16395|ASPH. CONC. TY. | 4892| | |------------|BM-25.0A (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0080 | 54020|TYPE A PAVEMENT LINE | 18348| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54042|TYPE B CLASS I PAVE. | 48| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54049|TYPE B CLASS III PAVE. | 115728| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0120 | 54050|TYPE B CLASS III PAVE. | 33898| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54106|ERADICATION OF EXIST. | 992| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM2H89445 STATE PROJ NUM: PM2H-033-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(232) ORDER NO. 211 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0140 | 54217|SNOW PLOW. RAISED | 196| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0150 | 54300|PAVEMENT MESSAGE MARK. | 14| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2K89448 STATE PROJ NUM: PM2K-080-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(234) ORDER NO. 212 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 296| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 17269| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 498829| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 16389|FLEXIBLE PAVEMENT EDGE | 7885| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 54050|TYPE B CLASS III PAVE. | 129946| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54217|SNOW PLOW. RAISED | 672| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM2L89446 STATE PROJ NUM: PM2L-009-F09, P401 FEDERAL PROJ NUM:AC-STP-PM02(236) ORDER NO. 213 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1820| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 11205| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16370|ASPHALT CONCRETE | 3388| | |------------|TY. IM-19.0D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 123200| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 1126| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0060 | 16395|ASPH. CONC. TY. | 3306| | |------------|BM-25.0A (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0080 | 54042|TYPE B CLASS I PAVE. | 168| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54049|TYPE B CLASS III PAVE. | 194424| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54106|ERADICATION OF EXIST. | 400| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0110 | 54300|PAVEMENT MESSAGE MARK. | 1| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PM4A90610 STATE PROJ NUM: PM4A-058-026,N501 FEDERAL PROJ NUM:AC-STP-PM04(238) ORDER NO. 406 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 3732| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 23276| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16365|ASPHALT CONCRETE | 169| | |------------|TY. IM-19.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 372275| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 939| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 54020|TYPE A PAVEMENT LINE | 156360| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54032|TYPE B CLASS I PAVE. | 138290| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54042|TYPE B CLASS I PAVE. | 30| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54105|ERADICATION OF EXIST. | 62690| | |------------|PAVEMENT MARKING |---------| | |512 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PM4B90611 STATE PROJ NUM: PM4B-004-031,N501 FEDERAL PROJ NUM:AC-STP-PM04(239) ORDER NO. 407 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 674| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16350|ASPHALT CONCRETE | 12557| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 166655| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 16389|FLEXIBLE PAVEMENT EDGE | 10296| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 54020|TYPE A PAVEMENT LINE | 46180| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0060 | 54032|TYPE B CLASS I PAVE. | 67220| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54042|TYPE B CLASS I PAVE. | 153| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54105|ERADICATION OF EXIST. | 29000| | |------------|PAVEMENT MARKING |---------| | |512 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54106|ERADICATION OF EXIST. | 54| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0100 | 54300|PAVEMENT MESSAGE MARK. | 4| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PM4D90613 STATE PROJ NUM: PM4D-020-028,N501 FEDERAL PROJ NUM:AC-STP-PM04(240) ORDER NO. 408 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 188| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 9595| | |------------|IM-19.0D(M) |---------| | |211 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16350|ASPHALT CONCRETE | 30793| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16355|ASPHALT CONCRETE | 7306| | |------------|TY. SM-12.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0050 | 16360|ASPHALT CONCRETE | 9761| | |------------|TY. SM-12.5E (76-22) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0060 | 16373|ASPH. CONC. TY. | 1543| | |------------|IM-19.0A (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0070 | 16388|FLEXIBLE PAVEMENT | 1598297| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0080 | 51615|14/1 ENCLOSED COND. | 9904| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 51912|SAW CUT 3/8" | 3754| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 51913|SAWCUT 5/8" | 131| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54020|TYPE A PAVEMENT LINE | 189050| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM409PM4D90613 STATE PROJ NUM: PM4D-020-028,N501 FEDERAL PROJ NUM:AC-STP-PM04(240) ORDER NO. 408 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54022|TYPE A PAVEMENT LINE | 9600| | |------------|MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54032|TYPE B CLASS I PAVE. | 166675| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54034|TYPE B CLASS I PAVE. | 120| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54037|TYPE B CLASS I PAVE. | 2400| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54042|TYPE B CLASS I PAVE. | 1080| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0170 | 54105|ERADICATION OF EXIST. | 36125| | |------------|PAVEMENT MARKING |---------| | |512 | | LF | | | | -------------------------------------------------------------------------------- |0180 | 54106|ERADICATION OF EXIST. | 1078| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0190 | 54254|PAVEMENT MESSAGE MARK. | 7| | |------------|BICYCLE LANE SYMBOL |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0200 | 54300|PAVEMENT MESSAGE MARK. | 116| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0210 | 54400|PAVEMENT MESSAGE MARK. | 6| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0220 | 54401|PAVE. MESSAGE MARK. | 4| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0230 | 56021|1" PVC CONDUIT | 129| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 4 CONTRACT ID : CM409PM4D90613 STATE PROJ NUM: PM4D-020-028,N501 FEDERAL PROJ NUM:AC-STP-PM04(240) ORDER NO. 408 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PM4E90614 STATE PROJ NUM: PM4E-043-029,N501 FEDERAL PROJ NUM:AC-STP-PM04(241) ORDER NO. 409 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 17| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 380| | |------------|IM-19.0D(M) |---------| | |211 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 2105| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16345|ASPHALT CONCRETE | 2612| | |------------|TY. SM-9.5E (76-22) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0050 | 16355|ASPHALT CONCRETE | 8364| | |------------|TY. SM-12.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0060 | 16360|ASPHALT CONCRETE | 6151| | |------------|TY. SM-12.5E (76-22) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0070 | 16370|ASPHALT CONCRETE | 69| | |------------|TY. IM-19.0D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0080 | 16374|ASPH. CONC. TY. | 77| | |------------|IM-19.0D (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0090 | 16388|FLEXIBLE PAVEMENT | 725161| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0100 | 16392|ASPHALT CONCRETE | 410| | |------------|TY. BM-25.0D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0110 | 51615|14/1 ENCLOSED COND. | 5384| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM409PM4E90614 STATE PROJ NUM: PM4E-043-029,N501 FEDERAL PROJ NUM:AC-STP-PM04(241) ORDER NO. 409 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 51911|SAW CUT | 2764| | |------------|SAW AND SEAL |---------| | |ATTD | |LF | | | | -------------------------------------------------------------------------------- |0130 | 51912|SAW CUT 3/8" | 3158| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 51913|SAWCUT 5/8" | 96| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54020|TYPE A PAVEMENT LINE | 81548| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54032|TYPE B CLASS I PAVE. | 65832| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0170 | 54034|TYPE B CLASS I PAVE. | 100| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0180 | 54042|TYPE B CLASS I PAVE. | 367| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0190 | 54101|PAVEMENT MARKING | 1| | |------------|STOP |---------| | |704 | |EA | | | | -------------------------------------------------------------------------------- |0200 | 54300|PAVEMENT MESSAGE MARK. | 22| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0210 | 54310|PAVEMENT MESSAGE MARK. | 3| | |------------|ELONGATED ARROW DOUBLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0220 | 54400|PAVEMENT MESSAGE MARK. | 2| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0230 | 54404|PAVE. MESSAGE MARK. | 2| | |------------|R/R CROSSING |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 4 CONTRACT ID : CM409PM4E90614 STATE PROJ NUM: PM4E-043-029,N501 FEDERAL PROJ NUM:AC-STP-PM04(241) ORDER NO. 409 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0240 | 56021|1" PVC CONDUIT | 89| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PM4F90615 STATE PROJ NUM: PM4F-042-030,N501 FEDERAL PROJ NUM:AC-STP-PM04(242) ORDER NO. 410 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 126| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 109| | |------------|IM-19.0D(M) |---------| | |211 | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16350|ASPHALT CONCRETE | 7461| | |------------|TY. SM-12.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16360|ASPHALT CONCRETE | 735| | |------------|TY. SM-12.5E (76-22) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0050 | 16365|ASPHALT CONCRETE | 1364| | |------------|TY. IM-19.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0060 | 16388|FLEXIBLE PAVEMENT | 314437| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0070 | 51615|14/1 ENCLOSED COND. | 424| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51912|SAW CUT 3/8" | 162| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 51913|SAWCUT 5/8" | 10| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54020|TYPE A PAVEMENT LINE | 40776| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54032|TYPE B CLASS I PAVE. | 22952| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM409PM4F90615 STATE PROJ NUM: PM4F-042-030,N501 FEDERAL PROJ NUM:AC-STP-PM04(242) ORDER NO. 410 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54037|TYPE B CLASS I PAVE. | 2230| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54040|TYPE B CLASS I PAVE. | 35| | |------------|LINE MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54042|TYPE B CLASS I PAVE. | 726| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54300|PAVEMENT MESSAGE MARK. | 44| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0160 | 54400|PAVEMENT MESSAGE MARK. | 5| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 56021|1" PVC CONDUIT | 10| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5A89796 STATE PROJ NUM: PM5A-090-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(225) ORDER NO. 506 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 336| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 99| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 5984| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 147558| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 54032|TYPE B CLASS I PAVE. | 77600| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5B89797 STATE PROJ NUM: PM5B-091-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(226) ORDER NO. 507 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 803| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16340|ASPHALT CONCRETE | 6029| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 21167| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 172600| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54100|PAVEMENT MARKING | 190| | |------------|RUMBLE STRIP |---------| | |ATTD |ACROSS LANE TYPE |LF | | | | -------------------------------------------------------------------------------- |0060 | 54210|REMOVE EXIST. RAISED | 53| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- |0070 | 54217|SNOW PLOW. RAISED | 76| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0080 | 54300|PAVEMENT MESSAGE MARK. | 11| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5C89795 STATE PROJ NUM: PM5C-046-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(227) ORDER NO. 508 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- A |0010 | 10497|PAVEMENT | 1219| | |------------|TY. A CRACK |---------| | |ATTD |SEALANT/FILLER |LB | | | | -------------------------------------------------------------------------------- |0020 | 16242|AGGR. BASE MATL. TY. I | 1642| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16335|ASPHALT CONCRETE | 5406| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16340|ASPHALT CONCRETE | 9936| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0050 | 16388|FLEXIBLE PAVEMENT | 20275| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 16389|FLEXIBLE PAVEMENT EDGE | 5966| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0070 | 54032|TYPE B CLASS I PAVE. | 222580| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54037|TYPE B CLASS I PAVE. | 800| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54042|TYPE B CLASS I PAVE. | 914| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54106|ERADICATION OF EXIST. | 1768| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0110 | 54210|REMOVE EXIST. RAISED | 532| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM5C89795 STATE PROJ NUM: PM5C-046-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(227) ORDER NO. 508 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54217|SNOW PLOW. RAISED | 532| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0130 | 54300|PAVEMENT MESSAGE MARK. | 39| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0140 | 54401|PAVE. MESSAGE MARK. | 2| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0150 | 54404|PAVE. MESSAGE MARK. | 2| | |------------|R/R CROSSING |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5D89794 STATE PROJ NUM: PM5D-087-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(228) ORDER NO. 509 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- A |0010 | 10497|PAVEMENT | 14329| | |------------|TY. A CRACK |---------| | |ATTD |SEALANT/FILLER |LB | | | | -------------------------------------------------------------------------------- |0020 | 10700|RUMBLE STRIP, ASPHALT | 31000| | |------------| |---------| | |315 | | LF | | | | -------------------------------------------------------------------------------- A |0030 | 10701|LIQUID ASPHALT COATING | 4582| | |------------|(RUMBLE STRIP) |---------| | |315 | | SY | | | | -------------------------------------------------------------------------------- |0040 | 16242|AGGR. BASE MATL. TY. I | 1431| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0050 | 16340|ASPHALT CONCRETE | 90| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0060 | 16389|FLEXIBLE PAVEMENT EDGE | 2816| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0070 | 16403|STONE MATRIX ASPHALT | 15758| | |------------|SMA-12.5(76-22) |---------| | |317 | | TON | | | | -------------------------------------------------------------------------------- |0080 | 51615|14/1 ENCLOSED COND. | 500| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 51911|SAW CUT | 200| | |------------|3/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0100 | 51911|SAW CUT | 75| | |------------|5/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0110 | 54020|TYPE A PAVEMENT LINE | 129800| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM5D89794 STATE PROJ NUM: PM5D-087-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(228) ORDER NO. 509 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54032|TYPE B CLASS I PAVE. | 71400| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54042|TYPE B CLASS I PAVE. | 400| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54100|PAVEMENT MARKING | 740| | |------------|RUMBLE STRIP |---------| | |ATTD |ACROSS LANE TYPE |LF | | | | -------------------------------------------------------------------------------- |0150 | 54105|ERADICATION OF EXIST. | 14400| | |------------|PAVEMENT MARKING |---------| | |512 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54106|ERADICATION OF EXIST. | 565| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- |0170 | 54210|REMOVE EXIST. RAISED | 2526| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 54217|SNOW PLOW. RAISED | 2526| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0190 | 54300|PAVEMENT MESSAGE MARK. | 11| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0200 | 56021|1" PVC CONDUIT | 25| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5E90054 STATE PROJ NUM: PM5E-040-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(229) ORDER NO. 510 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 10700|RUMBLE STRIP, ASPHALT | 4050| | |------------| |---------| | |315 | | LF | | | | -------------------------------------------------------------------------------- A |0020 | 10701|LIQUID ASPHALT COATING | 752| | |------------|(RUMBLE STRIP) |---------| | |315 | | SY | | | | -------------------------------------------------------------------------------- |0030 | 16242|AGGR. BASE MATL. TY. I | 937| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16340|ASPHALT CONCRETE | 4234| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 3590| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 54034|TYPE B CLASS I PAVE. | 11000| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54037|TYPE B CLASS I PAVE. | 1200| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54210|REMOVE EXIST. RAISED | 160| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- |0090 | 54217|SNOW PLOW. RAISED | 160| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0100 | 54300|PAVEMENT MESSAGE MARK. | 3| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5G89801 STATE PROJ NUM: PM5G-047-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(230) ORDER NO. 511 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 736| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 4498| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 13004| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 226881| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 12672| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 51615|14/1 ENCLOSED COND. | 9500| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 51911|SAW CUT | 4150| | |------------|3/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0080 | 51911|SAW CUT | 1200| | |------------|5/8" |---------| | |703 | |LF | | | | -------------------------------------------------------------------------------- |0090 | 54032|TYPE B CLASS I PAVE. | 199545| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54037|TYPE B CLASS I PAVE. | 100| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54042|TYPE B CLASS I PAVE. | 6775| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM5G89801 STATE PROJ NUM: PM5G-047-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(230) ORDER NO. 511 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54101|PAVEMENT MARKING | 4| | |------------|PEDESTRIAN SYMBOL |---------| | |ATTD | |EA | | | | -------------------------------------------------------------------------------- |0130 | 54210|REMOVE EXIST. RAISED | 1305| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- |0140 | 54217|SNOW PLOW. RAISED | 1305| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0150 | 54300|PAVEMENT MESSAGE MARK. | 130| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0160 | 54310|PAVEMENT MESSAGE MARK. | 1| | |------------|ELONGATED ARROW DOUBLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 54401|PAVE. MESSAGE MARK. | 6| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 56021|1" PVC CONDUIT | 1150| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5H90052 STATE PROJ NUM: PM5H-001-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(231) ORDER NO. 512 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 842| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 3612| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16337|ASPH. CONC. TY. | 372| | |------------|SM-9.5ASL (SPOT LEVEL) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16340|ASPHALT CONCRETE | 15529| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0050 | 16388|FLEXIBLE PAVEMENT | 136206| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 16389|FLEXIBLE PAVEMENT EDGE | 48893| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0070 | 54020|TYPE A PAVEMENT LINE | 1500| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 54032|TYPE B CLASS I PAVE. | 67450| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54034|TYPE B CLASS I PAVE. | 106500| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54042|TYPE B CLASS I PAVE. | 36| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54106|ERADICATION OF EXIST. | 310| | |------------|NONLINEAR PAVE.MARKING |---------| | |512 | | SF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM009PM5H90052 STATE PROJ NUM: PM5H-001-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(231) ORDER NO. 512 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54210|REMOVE EXIST. RAISED | 1403| | |------------|PAVEMENT MARKER |---------| | |510 | | EA | | | | -------------------------------------------------------------------------------- |0130 | 54217|SNOW PLOW. RAISED | 1476| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0140 | 54300|PAVEMENT MESSAGE MARK. | 61| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0150 | 54401|PAVE. MESSAGE MARK. | 4| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0160 | 54404|PAVE. MESSAGE MARK. | 3| | |------------|R/R CROSSING |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM009PM5J90053 STATE PROJ NUM: PM5J-065-F09, P501 FEDERAL PROJ NUM:AC-STP-PM05(232) ORDER NO. 513 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 824| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 9727| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0030 | 16388|FLEXIBLE PAVEMENT | 18374| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0040 | 54032|TYPE B CLASS I PAVE. | 123750| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM909PMA90046 STATE PROJ NUM: PM-9A-09 FEDERAL PROJ NUM:AC-STP-PM09(242) ORDER NO. 902 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 1141| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16330|ASPHALT CONCRETE | 1288| | |------------|TY. SM-9.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16335|ASPHALT CONCRETE | 12787| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16340|ASPHALT CONCRETE | 24674| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0050 | 16365|ASPHALT CONCRETE | 599| | |------------|TY. IM-19.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0060 | 16388|FLEXIBLE PAVEMENT | 957280| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0070 | 51615|14/1 ENCLOSED COND. | 60098| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51912|SAW CUT 3/8" | 20330| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 51913|SAWCUT 5/8" | 2265| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54032|TYPE B CLASS I PAVE. | 222947| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54034|TYPE B CLASS I PAVE. | 11150| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM909PMA90046 STATE PROJ NUM: PM-9A-09 FEDERAL PROJ NUM:AC-STP-PM09(242) ORDER NO. 902 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54037|TYPE B CLASS I PAVE. | 7184| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54042|TYPE B CLASS I PAVE. | 8760| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54075|TYPE B CLASS VI PAVE. | 95861| | |------------|LINE MARKING 4" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54077|TYPE B CLASS VI PAVE. | 2800| | |------------|LINE MARKING 8" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54217|SNOW PLOW. RAISED | 464| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 54254|PAVEMENT MESSAGE MARK. | 30| | |------------|BICYCLE LANE SYMBOL |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 54300|PAVEMENT MESSAGE MARK. | 163| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0190 | 54400|PAVEMENT MESSAGE MARK. | 7| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0200 | 54401|PAVE. MESSAGE MARK. | 4| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0210 | 56022|1" METAL CONDUIT | 1005| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM909PMB90047 STATE PROJ NUM: PM-9B-09 FEDERAL PROJ NUM:AC-STP-PM09(243) ORDER NO. 903 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- A |0010 | 16330|ASPHALT CONCRETE | 175| | |------------|TY. SM-9.0A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 10123| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 21811| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 773635| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 20536| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 51615|14/1 ENCLOSED COND. | 56516| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 51912|SAW CUT 3/8" | 28284| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51913|SAWCUT 5/8" | 2400| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54032|TYPE B CLASS I PAVE. | 101620| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54034|TYPE B CLASS I PAVE. | 9300| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54037|TYPE B CLASS I PAVE. | 800| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM909PMB90047 STATE PROJ NUM: PM-9B-09 FEDERAL PROJ NUM:AC-STP-PM09(243) ORDER NO. 903 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54040|TYPE B CLASS I PAVE. | 80| | |------------|LINE MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54042|TYPE B CLASS I PAVE. | 7086| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54075|TYPE B CLASS VI PAVE. | 117109| | |------------|LINE MARKING 4" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54077|TYPE B CLASS VI PAVE. | 2200| | |------------|LINE MARKING 8" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54078|TYPE B CLASS VI PAVE. | 224| | |------------|LINE MARKING 12" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0170 | 54101|PAVEMENT MARKING | 22| | |------------|STOP AHEAD |---------| | |704 | |EA | | | | -------------------------------------------------------------------------------- |0180 | 54217|SNOW PLOW. RAISED | 60| | |------------|PAVE. MARKER ASPH.CONC |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0190 | 54300|PAVEMENT MESSAGE MARK. | 118| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0200 | 54401|PAVE. MESSAGE MARK. | 11| | |------------|SCHOOL ZONE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0210 | 56022|1" METAL CONDUIT | 1065| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM909PMC90048 STATE PROJ NUM: PM-9C-09 FEDERAL PROJ NUM:AC-STP-PM09(244) ORDER NO. 904 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 407| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 12091| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 13364| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 1066868| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 54912| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- A |0060 | 16395|ASPH. CONC. TY. | 6233| | |------------|BM-25.0A (T) |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0070 | 51615|14/1 ENCLOSED COND. | 29452| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51912|SAW CUT 3/8" | 9768| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 51913|SAWCUT 5/8" | 1110| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54032|TYPE B CLASS I PAVE. | 84186| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54034|TYPE B CLASS I PAVE. | 8200| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM909PMC90048 STATE PROJ NUM: PM-9C-09 FEDERAL PROJ NUM:AC-STP-PM09(244) ORDER NO. 904 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54037|TYPE B CLASS I PAVE. | 2702| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54042|TYPE B CLASS I PAVE. | 2937| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54075|TYPE B CLASS VI PAVE. | 45285| | |------------|LINE MARKING 4" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54077|TYPE B CLASS VI PAVE. | 8010| | |------------|LINE MARKING 8" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0160 | 54078|TYPE B CLASS VI PAVE. | 400| | |------------|LINE MARKING 12" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0170 | 54254|PAVEMENT MESSAGE MARK. | 30| | |------------|BICYCLE LANE SYMBOL |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 54300|PAVEMENT MESSAGE MARK. | 81| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0190 | 54400|PAVEMENT MESSAGE MARK. | 16| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0200 | 56022|1" METAL CONDUIT | 565| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM909PMG90044 STATE PROJ NUM: PM-9G-09 FEDERAL PROJ NUM:AC-STP-PM09(245) ORDER NO. 905 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 732| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16325|ASPHALT CONCRETE | 627| | |------------|SM-9.5A(S) |---------| | |ATTD | |TON | | | | -------------------------------------------------------------------------------- A |0030 | 16335|ASPHALT CONCRETE | 13344| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0040 | 16340|ASPHALT CONCRETE | 9762| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0050 | 16388|FLEXIBLE PAVEMENT | 794857| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 51615|14/1 ENCLOSED COND. | 20564| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 51912|SAW CUT 3/8" | 6228| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51913|SAWCUT 5/8" | 990| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54032|TYPE B CLASS I PAVE. | 62178| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54034|TYPE B CLASS I PAVE. | 550| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54042|TYPE B CLASS I PAVE. | 7662| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM909PMG90044 STATE PROJ NUM: PM-9G-09 FEDERAL PROJ NUM:AC-STP-PM09(245) ORDER NO. 905 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54075|TYPE B CLASS VI PAVE. | 33125| | |------------|LINE MARKING 4" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54076|TYPE B CLASS VI PAVE. | 3640| | |------------|LINE MARKING 6" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54077|TYPE B CLASS VI PAVE. | 3600| | |------------|LINE MARKING 8" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54300|PAVEMENT MESSAGE MARK. | 74| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0160 | 54400|PAVEMENT MESSAGE MARK. | 4| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 54404|PAVE. MESSAGE MARK. | 2| | |------------|R/R CROSSING |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 56022|1" METAL CONDUIT | 1858| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM909PMF90045 STATE PROJ NUM: PM-9F-09 FEDERAL PROJ NUM:AC-STP-PM09(246) ORDER NO. 906 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 16242|AGGR. BASE MATL. TY. I | 3255| | |------------|OR II NO. 21A OR 21B |---------| | |ATTD | | TON | | | | -------------------------------------------------------------------------------- A |0020 | 16335|ASPHALT CONCRETE | 16535| | |------------|TY. SM-9.5A |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- A |0030 | 16340|ASPHALT CONCRETE | 18647| | |------------|TY. SM-9.5D |---------| | |315 | | TON | | | | -------------------------------------------------------------------------------- |0040 | 16388|FLEXIBLE PAVEMENT | 532696| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0050 | 16389|FLEXIBLE PAVEMENT EDGE | 31680| | |------------|PLANING (MAINTENANCE) |---------| | |ATTD | | SY | | | | -------------------------------------------------------------------------------- |0060 | 51615|14/1 ENCLOSED COND. | 20178| | |------------|CABLE |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 51912|SAW CUT 3/8" | 4185| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0080 | 51913|SAWCUT 5/8" | 2628| | |------------| |---------| | |703 | | LF | | | | -------------------------------------------------------------------------------- |0090 | 54032|TYPE B CLASS I PAVE. | 77551| | |------------|LINE MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0100 | 54034|TYPE B CLASS I PAVE. | 10100| | |------------|LINE MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0110 | 54037|TYPE B CLASS I PAVE. | 1400| | |------------|LINE MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 3 CONTRACT ID : CM909PMF90045 STATE PROJ NUM: PM-9F-09 FEDERAL PROJ NUM:AC-STP-PM09(246) ORDER NO. 906 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |0120 | 54042|TYPE B CLASS I PAVE. | 5250| | |------------|LINE MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0130 | 54075|TYPE B CLASS VI PAVE. | 141400| | |------------|LINE MARKING 4" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0140 | 54077|TYPE B CLASS VI PAVE. | 3200| | |------------|LINE MARKING 8" |---------| | |ATTD704 | | LF | | | | -------------------------------------------------------------------------------- |0150 | 54101|PAVEMENT MARKING | 4| | |------------|STOP AHEAD |---------| | |ATTD | |EA | | | | -------------------------------------------------------------------------------- |0160 | 54300|PAVEMENT MESSAGE MARK. | 133| | |------------|ELONGATED ARROW SINGLE |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0170 | 54400|PAVEMENT MESSAGE MARK. | 6| | |------------|"ONLY" |---------| | |704 | | EA | | | | -------------------------------------------------------------------------------- |0180 | 56022|1" METAL CONDUIT | 75| | |------------| |---------| | |700 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : C00089145B06 STATE PROJ NUM: BRDG-068-569, B606 FEDERAL PROJ NUM:NONE ORDER NO. Q14 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 00100|MOBILIZATION | 1| | |------------| |---------| | |513 | | LS | | | | -------------------------------------------------------------------------------- |0020 | 24265|MAINTENANCE OF TRAFFIC | 1| | ------------|STR. 1900 |---------| | |ATTD 512 | |LS | | | | -------------------------------------------------------------------------------- |0030 | 69074|SHOTCRETE, CLASS A | 640| | |------------| |---------| | |412 | | SF | | | | -------------------------------------------------------------------------------- |0040 | 69620|COFFERDAM | 2| | |------------| |---------| | |401 | | EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM509SOA39554 STATE PROJ NUM: SO-5A-09 FEDERAL PROJ NUM:NONE ORDER NO. Q15 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 00100|MOBILIZATION | 1| | |------------| |---------| | |513 | | LS | | | | -------------------------------------------------------------------------------- |0020 | 69905|BR. SUBSTR. WID./REPAIR| 31| | |------------|INSTALL RUBBING APRON |---------| | |ATTD | |EA | | | | -------------------------------------------------------------------------------- |0030 | 69905|BR. SUBSTR. WID./REPAIR| 1| | |------------|REMOVE EXISTING DOLPHI |---------| | |ATTD |N (19 PILE) |EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM809TPA57517 STATE PROJ NUM: TP-8A-09 FEDERAL PROJ NUM:NONE ORDER NO. Q27 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 24272|TRUCK MOUNTED | 500| | |------------|ATTENUATOR |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0020 | 24279|PORTABLE CHANGEABLE | 100| | |------------|MESSAGE SIGN |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0030 | 24281|ELECTRONIC ARROW | 500| | |------------| |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0040 | 54020|TYPE A PAVEMENT LINE | 14000000| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54024|TYPE A PAVEMENT LINE | 55000| | |------------|MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM809TPB57517 STATE PROJ NUM: TP-8B-09 FEDERAL PROJ NUM:NONE ORDER NO. Q28 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 24272|TRUCK MOUNTED | 650| | |------------|ATTENUATOR |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0020 | 24279|PORTABLE CHANGEABLE | 50| | |------------|MESSAGE SIGN |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0030 | 24281|ELECTRONIC ARROW | 650| | |------------| |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0040 | 54020|TYPE A PAVEMENT LINE | 19500000| | |------------|MARKING 4" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54024|TYPE A PAVEMENT LINE | 45000| | |------------|MARKING 8" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM409PSA39662 STATE PROJ NUM: PS-4A-09 FEDERAL PROJ NUM:NONE ORDER NO. Q31 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 10497|PAVEMENT | 195566| | |------------|CRACK SEAL TYPE A |---------| | |ATTD | |LB | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- | | | | | | |------------| |---------| | | | | | | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY E22-PSPPROP VIRGINIA DEPARTMENT OF TRANSPORTATION PAGE: 2 CONTRACT ID : CM809TPC57517 STATE PROJ NUM: TP-9C-09 FEDERAL PROJ NUM:NONE ORDER NO. Q40 DATE 01/27/09 SCHEDULE OF ITEMS REVISED CONTRACTOR :____________________________________________________________________ -------------------------------------------------------------------------------- MC | LINE| ITEM | ITEM | APP QTY.| UNIT PRICE | BID AMOUNT |------------| DESCRIPTION |---------|--------------|-------------- |SPEC NUMBER | | UNITS | DOLLARS|CTS | DOLLARS|CTS -------------------------------------------------------------------------------- | COMMON ITEMS -------------------------------------------------------------------------------- |0010 | 24272|TRUCK MOUNTED | 100| | |------------|ATTENUATOR |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0020 | 24281|ELECTRONIC ARROW | 150| | |------------| |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0030 | 24282|FLAGGER SERVICE | 300| | |------------| |---------| | |512 | | HR | | | | -------------------------------------------------------------------------------- |0040 | 54022|TYPE A PAVEMENT LINE | 3300| | |------------|MARKING 6" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0050 | 54026|TYPE A PAVEMENT LINE | 850| | |------------|MARKING 12" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0060 | 54028|TYPE A PAVEMENT LINE | 6200| | |------------|MARKING 24" |---------| | |704 | | LF | | | | -------------------------------------------------------------------------------- |0070 | 54101|PAVEMENT MARKING | 350| | |------------|MESSAGE RXR CROSSING, |---------| | |704 |TY. A |EA | | | | -------------------------------------------------------------------------------- |0080 | 54101|PAVEMENT MARKING | 225| | |------------|MESSAGE ELONG. SINGLE |---------| | |704 |ARROW, TY. A |EA | | | | -------------------------------------------------------------------------------- |0090 | 54101|PAVEMENT MARKING | 170| | |------------|MESSAGE SCHOOL ZONE, |---------| | |704 |TY. A |EA | | | | -------------------------------------------------------------------------------- | TOTAL ITEMS IN SECTION 0001 | | | -------------------------------------------------------------------------------- | TOTAL BID | | | -------------------------------------------------------------------------------- A = PRICE ADJUSTMENT ITEM M = MAJOR ITEM S = SPECIALTY ITEM F = FUEL ADJUSTMENT ITEM P = PLAN QUANTITY