VIRGINIA DEPARTMENT OF TRANSPORTATION DATE : 12/18/03 PAGE : E58 -1 TABULATION OF BIDS CALL ORDER : E58 CONTRACT ID : CM504ERA39768 COUNTIES : NANSEMOND LETTING DATE : 12/16/03 10:00 A.M. DISTRICT : 05 CONTRACT TIME : 03/04/08 COMPLETION DATE CONTRACT DESCRIPTION : RURAL PROJECT(S) : NONE/ER-5A-04 SET-ASIDE : VENDOR RANKING : -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 H301 HOWARD BROTHERS CONTRACTOR, INC. $ 1,802,075.76 100.0000% 2 C333 CURTIS CONTRACTING, INC. $ 1,887,317.20 104.7301% 3 E009 W. C. ENGLISH, INCORPORATED $ 2,585,843.00 143.4924% ==================================================================================================================================== |(1) H301 |(2) C333 |(3) E009 |HOWARD BROTHERS CONTRACTOR, |CURTIS CONTRACTING, INC. |W. C. ENGLISH, INCORPORATED LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 REPAIR CAUSEWAY DAMAGED BY HURRICANE ISABELL | | | 0005 00100 LUMP| 120000.00000 120000.00| 145283.97000 145283.97| 151000.00000 151000.00 MOBILIZATION | | | 0010 00101 LUMP| 24000.00000 24000.00| 2714.19000 2714.19| 10000.00000 10000.00 CONSTRUCTION SURVEYING | | | 0015 00125 LUMP| 103000.00000 103000.00| 70406.95000 70406.95| 85000.00000 85000.00 GRADING | | | 0020 00305 233.000 CY | 40.00000 9320.00| 28.79000 6708.07| 20.00000 4660.00 NS SELECT MATERIAL SELECT MATERIAL | | | MINIMUM CBR-10 ATTD | | | 0025 00519 102600.000 SF | 12.80000 1313280.00| 13.40000 1374840.00| 19.60000 2010960.00 SHEET PILE, STEEL | | | 0030 10128 541.000 TON | 30.00000 16230.00| 30.23000 16354.43| 25.00000 13525.00 AGGR. BASE MATL. TY. I NO. 21B | | | 0035 10612 228.000 TON | 60.00000 13680.00| 69.19000 15775.32| 64.00000 14592.00 ASPHALT CONCRETE BASE COURSE TY. BM-25.0| | | 0040 10635 318.000 TON | 62.00000 19716.00| 67.37000 21423.66| 66.00000 20988.00 ASPHALT CONCRETE TY. SM-9.5A | | | 0045 11070 185.000 LF | 5.00000 925.00| 3.26000 603.10| 12.00000 2220.00 NS SAW CUT SAW CUT ASPHALT PAVE. 5.5 | | | INCH DEPTH ATTD | | | 0050 13345 4.000 EA | 1800.00000 7200.00| 1628.52000 6514.08| 2500.00000 10000.00 ALTERNATE BREAKWAY CABLE TERMINAL (GR-9)| | | 0055 13372 LUMP| 7000.00000 7000.00| 7056.90000 7056.90| 10000.00000 10000.00 NS SP.DES. GR.BR.ATTACH SP.DES. GR. BR. | | | ATTACH. SPECIAL DESIGN ATTACHEMNT ATTD | | | 0060 13400 2859.000 LF | 19.00000 54321.00| 20.29000 58009.11| 15.00000 42885.00 NS GUARDRAIL GUARDRAIL GUARDRAIL GR-2A | | | W/ DBL RAIL ATTD | | | VIRGINIA DEPARTMENT OF TRANSPORTATION DATE : 12/18/03 PAGE : E58 -2 TABULATION OF BIDS CALL ORDER : E58 CONTRACT ID : CM504ERA39768 COUNTIES : NANSEMOND LETTING DATE : 12/16/03 10:00 A.M. DISTRICT : 05 SET-ASIDE : ==================================================================================================================================== |(1) H301 |(2) C333 |(3) E009 |HOWARD BROTHERS CONTRACTOR, |CURTIS CONTRACTING, INC. |W. C. ENGLISH, INCORPORATED LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0065 24260 229.000 TON | 13.00000 2977.00| 18.25000 4179.25| 25.00000 5725.00 CR. RUN AGGR. NO. 25 OR 26 | | | 0070 24430 1659.000 SY | 4.00000 6636.00| 15.59000 25863.81| 3.00000 4977.00 DEMOLITION OF PAVEMENT (FLEXIBLE) | | | 0075 24601 3139.000 LF | 1.50000 4708.50| 1.26000 3955.14| 2.00000 6278.00 NS REMOVE EXIST. GUARDRAIL REMOVE EXIST.| | | GUARDRAIL REMOVE AND DISPOSE ATTD | | | 0080 25507 5.000 MO | 800.00000 4000.00| 1802.18000 9010.90| 1000.00000 5000.00 FIELD OFFICE TY.III | | | 0085 27022 1.000 ACRE| 50.00000 50.00| 10598.13000 10598.13| 1.00000 1.00 TOPSOIL CLASS B 2" | | | 0090 27102 82.000 LB | 15.00000 1230.00| 22.46000 1841.72| 30.00000 2460.00 REGULAR SEED | | | 0095 27103 51.000 LB | 1.00000 51.00| 9.22000 470.22| 20.00000 1020.00 OVERSEEDING | | | 0100 27215 1.000 TON | 650.00000 650.00| 775.81000 775.81| 1000.00000 1000.00 FERTILIZER(15-30-15) | | | 0105 27250 1.000 TON | 200.00000 200.00| 395.73000 395.73| 300.00000 300.00 LIME | | | 0110 27284 3853.000 SY | 0.10000 385.30| 1.43000 5509.79| 1.00000 3853.00 EROSION CONTROL MULCH | | | 0115 27321 50.000 SY | 10.00000 500.00| 2.46000 123.00| 5.00000 250.00 PROTECTIVE COVERING EC-2 | | | 0120 27422 4.000 EA | 50.00000 200.00| 299.03000 1196.12| 1000.00000 4000.00 DEWATERING BASIN | | | 0125 27430 106.000 CY | 0.01000 1.06| 10.32000 1093.92| 15.00000 1590.00 SILTATION CONTROL EXCAVATION | | | 0130 27505 625.000 LF | 1.50000 937.50| 7.47000 4668.75| 4.00000 2500.00 TEMP. SILT FENCE | | | 0135 27526 5479.000 LF | 10.60000 58077.40| 10.47000 57365.13| 21.00000 115059.00 TURBIDITY CURTAIN, IMPERVIOUS | | | 0140 41981 3000.000 LF | 9.60000 28800.00| 10.06000 30180.00| 16.00000 48000.00 NS WATER FACILITIES WATER FACILITIES | | | OIL CONTAINMENT BOOM ATTD | | | 0145 54032 8000.000 LF | 0.50000 4000.00| 0.55000 4400.00| 1.00000 8000.00 TYPE B CLASS I PAVE. LINE MARKING 4" | | | SECTION TOTALS | $ 1,802,075.76| $ 1,887,317.20| $ 2,585,843.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,802,075.76| $ 1,887,317.20| $ 2,585,843.00 ====================================================================================================================================