RELEASE:

CONTACT:
IMMEDIATE

Kelly Hannon 540-374-3344
Kelly.Hannon@VDOT.Virginia.Gov

LaTina W. Bundy 540-899-4560
Tina.Bundy@VDOT.virginia.gov

FRED-72548

April 16, 2014



ROUTE 1 NORTHBOUND LANE CLOSED AT FALMOUTH INTERSECTION
Left lane remains open, but motorists should expect delays at Stafford, Fredericksburg line

FREDERICKSBURG – The Virginia Department of Transportation (VDOT) has closed the northbound right lane of Route 1 in Stafford County from the Falmouth Bridge to the intersection of Route 17 Business and Route 218 (Butler Road) for emergency repairs to a drainage structure beneath the road.

 

The right lane is expected to remain closed until midday. The left lane remains open, but motorists should anticipate delays on Route 1 northbound near the Stafford County and City of Fredericksburg line.

 

VDOT will make repairs this morning to a concrete drop inlet, which channels stormwater to a drainage pipe beneath the road.

 

Real-time listings of work zones, congestion and incident information is available on VDOT’s 24-hour traffic information website, www.511Virginia.org.

 

Motorists can also access 511Virginia by calling 511 from any telephone in Virginia, or by downloading the free 511 Virginia mobile app.

 

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: April 16, 2014