RELEASE:

CONTACT:
IMMEDIATE

Marshall Herman 804-652-9689
Media Emergency Number 757-925-2584
HRO-70333

Jan. 20, 2014



HAMPTON ROADS PREPARING FOR WINTER WEATHER
VDOT crews and contractors pretreating roads

HAMPTON ROADS – Virginia Department of Transportation (VDOT) crews are currently pretreating roads one day ahead of snow forecasted to arrive on Tuesday afternoon in the Hampton Roads District.

District crews will then mobilize tomorrow morning to monitor and treat roads as long as conditions exist.

Pre-treatment is a form of anti-icing where chemicals are applied to area roads up to 48 hours before a winter storm. This prevents a bond from forming between the pavement and the snow and ice after the storm starts.

Motorists are advised to delay travel during winter weather. If travel is necessary, use extreme caution. When approaching slow-moving equipment treating roads, slow down and give equipment operators the right of way.

Motorists are encouraged to visit www.511virginia.org, call 511, download Virginia’s free 511 mobile app or listen to Highway Advisory Radio (HAR) 1680 AM or call the Traffic Information Line at 757-361-3016 for current traffic and travel information. Information is also available on Twitter @VaDOTHR.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Jan. 20, 2014