RELEASE:

CONTACT:
IMMEDIATE

Sandy Myers 540-332-9201
Sandy.Myers@vdot.virginia.gov
540-292-2500 (cell)
Ken Slack 540-332-9264
Ken.Slack@vdot.virginia.gov
540-414-5670 (cell)
STA12-091

June 29, 2012



TRAFFIC ALERT FOR WEEK OF JULY 2-6, 2012
Highway work zones in the Staunton District

STAUNTON – The following is a list of highway work that might affect traffic in the Staunton transportation district during the coming weeks. The Staunton district is comprised of 11 counties, Alleghany, Bath, Rockbridge, Augusta, Highland, Rockingham, Shenandoah, Frederick, Page, Warren and Clarke. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

 

(NEW)   Indicates a new or revised entry since last week’s report.

 

ALLEGHANY COUNTY

Interstate 64

* Mile marker 0 to 41, eastbound and westbound – Debris removal and clean ditches. Monday to Friday, 8 a.m. to 5 p.m. No work will occur on Wednesday.

* Mile marker 7.3 to 16.5, eastbound and westbound – Median Guardrail Installation Project. Single-lane traffic and shoulder closures, Monday to Saturday, 6 a.m. to 7 p.m. Estimated completion is Nov. 30.

* Mile marker 7.6, eastbound and westbound – Repair bridges over Ogle Creek. Single-lane closure and occasional shoulder closures, Monday to Thursday, 6 a.m. to 7:30 p.m. No work will occur the week of July 2. Estimated completion is July 20.

 

Primary Roads 

* Main Street (Route 60, Clifton Forge) – Smith Creek Bridge replacement project – Main Street, westbound from the intersection of Ridgeway Street to Commercial Avenue will be closed September 8, 2011 to October 12, 2012. Westbound traffic will detour onto Ridgeway Street. Ridgway Street, eastbound and westbound, will have two-way traffic during this time. Bridge construction will occur from September 19, 2011 to October 12, 2012. Main Street closed between Route 60/220 and Commercial Avenue. Detour signs through the area using Business Route 60 and West Ridgeway Street.

* Various roads – Brush cutting. Flagger traffic control, Monday to Friday 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

Secondary Roads

* Route 633 – Replacement of Cowpasture River Bridge and approaches from 1.46 miles south of Route 634 to 1.14 miles south of Route 634. Flagger traffic control, Monday to Sunday. Estimated completion is May 17, 2013.

* Various roads – Patching and pipe installation. Flagger traffic control, Monday to Friday 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

 

BATH COUNTY

Primary Roads

No closures reported.

 

Secondary Roads

* Various roads – Mowing, pipe maintenance, patching and grading. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

 

ROCKBRIDGE COUNTY

Interstate 64

* Mile marker 57 to 41, eastbound and westbound – Debris removal, Monday to Friday, 8 a.m. to 5 p.m. No work will occur on Wednesday.

 

Interstate 81

* Mile marker 173 to 205, northbound and southbound – Debris removal, ditch repair, sign work and rock removal from shoulders. Monday to Friday, 8 a.m. to 5 p.m. No work will occur on Wednesday.

* (UPDATE) Mile marker 195.6 to 202.5, northbound – Truck climbing lane project. On July 9, 10, 11 and 12 from 8 p.m. to 7 a.m. there will be a right-lane closure northbound from mile marker 199 to mile marker 202.5.  The exit ramp and on-ramp at exit 200 will also be closed during this period. Crews will be moving barriers in this location.

 

 

Primary Roads

* (NEW) Route 11 – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

* (NEW) Route 39 – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

*Route 252 (Brownsburg Turnpike) – Project at the bridge over Cedar Grove Branch. This location is 0.50 mile north of Route 712 (Decatur Road) and 0.98 mile south of Route 727 (Hyde Road). Bridge closed beginning June 13. Single-lane detour on temporary road next to the existing bridge. Traffic controlled by stop and proceed sign. Estimated completion is Aug. 2.

* Various roads – Pipe cleaning. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

Secondary Roads

* (NEW) Route 684 (Tinkerville Road) – Culvert replacement and minor ditch repairs.  Work zone is 1500-feet west of Route 813 (North Dry Well Road).  Road will be closed at this location on July 10.  Alternate weather date is July 11.

* (NEW) Route 716 – Road will be closed under the I-81 bridge from 7 a.m. to 5 p.m. as part of the work on I-81 on July 11.

*Various roads – Rough surface machining, paving, patching, ditching, pipe cleaning, pipe replacement, mowing and brush cutting. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

 

HIGHLAND COUNTY

Primary Roads

* Route 250 – Replacement of bridge over Crab Run in McDowell, from 0.01 mile east of Route 645 to 0.014 miles west of Route 654 (Doe Hill Road). Single-lane traffic with 14-foot width restriction and three-way traffic signal at Route 250 and intersection of Route 654. Flagger traffic control at various locations when needed. Work may take place 24 hours-a-day. Speed limit reduced to 25 mph. Estimated completion is October.

* Various roads – Mowing and plant mix repairs, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

Secondary Roads

* (NEW) Route 600 (Upper Back Creek Road) – Plant mix repairs, weekdays. No work will occur on Wednesday.

* (NEW) Route 604 (Valley Center Road) – Plant mix repairs, weekdays. No work will occur on Wednesday.

* Route 615 (Davis Run) – Paving project with tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

* Route 619 (Botkin Hollow) – Tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

* (NEW) Route 678 (Bullpasture River Road) – Ditch and shoulder repairs. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

* Various roads – Mowing and patching, Monday to Friday, 7:30 a.m. to 3 p.m. No work will occur on Wednesday.

 

 

AUGUSTA COUNTY 

Interstate 64

No closures reported.

 

Interstate 81

* Mile marker 205.1 to 237, northbound and southbound – Debris removal, ditch repair and sign work. Monday to Friday, 8 a.m. to 5 p.m. No work will occur on Wednesday.

* Mile marker 219 to 223, southbound – Guardrail replacement milling and paving. Alternating lane closures, Sunday night to Friday morning, 7 p.m. to 7 a.m.

 

Primary Roads

* (NEW) Route 42 – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

* Route 250, eastbound and westbound – Weedeating near guardrail, weekdays, 7:30 a.m. to 3:30 p.m.

* Route 340 – Paving from Route 612 to Rockingham County line. Single-lane closure, weeknights, 7 p.m. to 7 a.m. Flagger traffic control.

* Route 340 – Delphine Avenue Project. Traffic shift to the east side of Delphine Avenue. Restrip roadway. Sewer work to close 4th Street with a detour posted. Flagger traffic control, Monday to Friday, 7 a.m. to 5:30 p.m.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Route 615 – Road work, weekdays.

* Route 616 (Dam Town Road) – Bridge replacement from 0.12 mile west of Route 924 to 0.08 mile east of Route 11. New box culvert installation. Road closed, July 9 to 30.

* Route 617 – Road work, weekdays.

* Route 622 – Road work, weekdays.

* Route 764 – Patching from Route 730 (North River Road) and Route 758 (George Walton’s Road). Flagger traffic control, weekdays, 7:30 a.m. to 3:30 p.m.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

 

ROCKINGHAM COUNTY 

Interstate 81 

* Mile marker 237.51 to 263.9, northbound and southbound – Debris removal, sign work. Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Primary Roads

* Route 11 (North Valley Pike) – Pipe installation from Route 865 (Gravels Road) to Route 963 (Windy Knoll Drive). Intermittent lane closures, Monday to Friday, 9 a.m. to 3:30 p.m. Traffic controlled by pilot truck.

* Route 33 – Milling, paving and line painting from Route 981 to 2.30 miles west of Greene County line. Single-lane closure and occasional shoulder closures.

* Route 33, westbound (Rawley Pike) – Waterline installation at intersection of Route 726. Shoulder closed, weekdays, 7:30 a.m. to 4 p.m.

* Route 33 – Utility work from Route 276 (Cross Keys Road) to Route 704 (Boyers Road). Intermittent lane closures. Estimated completion is June 30.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads 

* Stone Spring Road – Erickson Avenue/Stone Spring Road Connector Project from Route 11 to Port Republic Road. Lane and shoulder closures, daily, 8 a.m. to 5 p.m. Estimated completion is spring 2013.

* Route 609 (Naked Creek Road) – Naked Creek Bridge Project. Replacement work at the intersection of Route 603 (Fleeburg Road, Page County) and Route 609. Periodic temporary lane closures, daily, 8 a.m. to 5 p.m. On May 22, the traffic pattern will shift from the existing bridge on Route 603 to a temporary bridge during construction of the permanent structure. Estimated completion is April 2013.

* Route 726 (Erickson Avenue) – Waterline installation from Route 33 (Rawley Pike) to Harrisonburg City limits. Intermittent lane closures with flaggers controlling traffic, Monday to Friday, 8 a.m. to 5 p.m.

* Route 727 (Airport Road) – Bridge from Route 11 (Lee Highway) to Route 696 (Kisers Road). Road closed until further notice.

* Route 1421 (Springbrook Road, Town of Broadway) – Replacement of bridge over Linville Creek from 0.275 miles west of Route 42 (South Main Street) to Route 42. Signalization upgrade at intersection of Route 42. Possible single lane closures controlled by flaggers Monday to Friday, 7:00 a.m. to 5:30 p.m. Estimated completion is April 30, 2013.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

 

PAGE COUNTY

Primary Road

* Route 211, westbound (New Market) – Milling and paving from Route 305 to Route 11. Flagger traffic control, Monday night to Friday morning, 7 p.m. t o7 a.m. Estimated completion is July 13.

* Route 340, northbound – Paving from Luray Corporate City limits to Route 661 (Sunnyview Drive). Single-lane traffic, weekdays, 7 a.m. to 5 p.m. Flagger traffic control. Estimated completion is mid July.

* Route 340 – Bridge construction work over Compton Creek and Norfolk Southern Railway and approaches, 1.4 miles south of the Page and Warren County lines to 3.50 miles south of the Page and Warren County lines. Daily lane closures with flagger traffic control. Shoulder closures, 24 hours-a-day. Speed limit reduced to 45 mph. Estimated completion is fall 2013.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Route 603 (Fleeburg Road) – Naked Creek Bridge Project. Replacement work at the intersection of Route 603 and Route 609 (Naked Creek Road). Periodic temporary lane closures, daily, 8 a.m. to 5 p.m. Estimated completion is April 2013.

* Route 686 (Smeltzer’s Road) – Compton Creek/Norfolk Southern Railroad Bridge project. New alignment of Route 340 (Stonewall Jackson Memorial Highway). Intersection of Route 686 (Smeltzer’s Road) and Route 340, from 0.24 miles south of the intersection of Route 662 (Compton Hollow Road) at Route 340, was permanently closed on May 23. A cul-de-sac will be constructed at the west end of Route 686. Motorists wishing to access Route 686 will need to turn off of Route 340 onto Route 662 and travel 0.26 miles east on Route 662 to the intersection of Route 686. Signs will be posted.

* Various roads – Mowing, pipe installation, patching, brush cutting, shoulder repairs, ditching operations and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

 

SHENANDOAH COUNTY

Interstate 81

* Mile marker 263.9 to 298, northbound and southbound – Debris removal, sign maintenance and clean guardrail. Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Primary Roads

* Route 11 (Old Valley Pike) – Safety improvement project at 5628 Main Street in the Town of Mount Jackson. Estimated completion is mid July.

* (NEW) Route 11 – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

Secondary Roads

* Route 623 – Back Road Project. Construction of new alignment Route 638 and Route 623. Daily blasting operations will occur. Traffic controlled by temporary traffic signals, Monday to Friday, 7 a.m. to7 p.m. Estimated completion is fall 2012.

* (NEW) Route 1041 – Paving operations in Town of New Market.  Work begins on July 5 and will be weekdays 7 a.m. to 7 p.m.  Flagger traffic control.  Completion is July 9.

* (NEW) Route 1044 – Paving operations in Town of New Market.  Work begins on July 5 and will be weekdays 7 a.m. to 7 p.m.  Flagger traffic control.  Completion is July 9.

* (NEW) Route 1045 – Paving operations in Town of New Market.  Work begins on July 5 and will be weekdays 7 a.m. to 7 p.m.  Flagger traffic control.  Completion is July 9.

* (NEW) Route 1046 – Paving operations in Town of New Market.  Work begins on July 5 and will be weekdays 7 a.m. to 7 p.m.  Flagger traffic control.  Completion is July 9.

* Various roads – Patching, mowing, drainage work, brush cutting, pipe cleaning and ditching.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

 

FREDERICK COUNTY

Interstate 81

* Mile marker 300 to 324, northbound and southbound – Debris removal, brush cutting and sign work. Monday to Friday, 8:30 a.m. to 4:30 p.m.

* Mile marker 313 to 315, northbound and southbound – In conjunction with the Route 657/Senseny Road Bridge deck replacement work. Shoulder closures and intermittent nighttime lane closures beginning Feb. 20 for installation of barrier for shoulder closures. Estimated completion is mid-August.

 

Primary Roads

* Route 7, eastbound and westbound – Close existing crossover at Route 656 (Morgan’s Mill Road). Left lane closed, Monday to Friday, 9 a.m. to 5 p.m. Estimated completion is Aug. 4.

 

Secondary Roads

* Route 657 (Senseny Road, Winchester) – Deck replacement work on bridge over I-81 from Millwood Pike (Route 522/50/17) and Berryville Pike (Route 7). Single-lane traffic with 10.5-foot width restriction, controlled by temporary signals. Estimated completion is mid-August.

* Various roads – Mowing and brush cutting.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

 

CLARKE COUNTY

Primary Roads

* Route 7, eastbound and westbound – Install turn lane extensions at various crossovers from Route 635 to Route 660. Left lane closed, Monday to Friday, 9 a.m. to 5 p.m. Estimated completion is Aug. 4.

* Route 7 Business (West Main Street) – Mosby Boulevard Project. Construction of Route 636/Mosby Boulevard extension and round about. Flagger traffic control. Estimated completion is May 2013.

 

Secondary Roads

* Various roads – Patching and mowing.

 

 

WARREN COUNTY

Interstate 66

* Mile marker 1 to 13, eastbound and westbound – Debris removal and drain cleaning, Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Interstate 81

* Mile marker 298 to 300, northbound and southbound – Debris removal and drain cleaning. Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Primary Roads.

* (NEW) Route 522 – Paving from Front Royal Town Limits to Rappahannock County Line, paving operations, Monday through Friday, 8pm to 8am. Traffic to be controlled by flaggers and pilot vehicle. Estimated completion is August 3, 2012.

* (NEW) Route 340  - Paving from Front Royal Town Limits to Route 619, north and south, Monday through Friday, 7pm to 8am. Alternating lane closures. Estimated completion is July 20, 2012.

 

Secondary Roads

* Route 681 – Recreational access to Eastham Park. Pavement widening on Luray Avenue. Lane and shoulder closures, daily, 7 a.m. to 5 p.m. Estimated completion is Sept. 28.

* Various roads – Pipe cleaning and mowing.

* (NEW) Various roads – Utility tree trimming.  Flagger traffic control during daylight hours, Monday to Friday.

 

Vegetation management may occur district wide on various routes.

 

Motorists are reminded to use extreme caution when traveling through work zones.

 

Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at 511Virginia.org. For other assistance call the VDOT Customer Service Center, available 24 hours-a-day, seven days a week. Citizens can dial 1-800-FOR- ROAD (1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.

 

VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at www.VirginiaDOT.org.

 

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 17, 2012