Place holder
Travel Center
Place holder
News
Place holder
Info Center
Place holder
Business Center
Place holder
Programs
Place holder
Projects
Place holder
About
Place holder
Jobs
Place holder
Sitemap
Place holder
Call 1-800-FOR-ROAD



Route 460 Location Study

H O M ES T U D Y O V E R V I E WC O N C E P T U A L A L T E R N A T I V E SC A N D I D A T E B U I L D A L T E R N A T I V E SM A P A N D S C H E D U L EL O C A T I O N 
S T U D Y P R O C E S SP U B L I C M E E T I N G ST O L L S T U D YS T U D Y T E A MC O N T A C T T H E T E A MN E W S L E T T E R SF A Q s

Toll Study

Funding has not been authorized for activities beyond the current study (e.g. design, right of way acquisition, construction). Therefore, tolls have been considered as an option to provide needed revenue.

VDOT prepared a study to assess the feasibility of tolling certain alternatives currently under study. The report only considered CBAs 1 and 3. (CBA 2 was not studied since it is not a limited access facility throughout its entire length).

Adobe Reader   Route 460 Toll Feasibility Study Summary Report


Page last modified: Aug. 12, 2008

 


Connect With Us...
View VDOT photo galleries on Flickr Find VDOT on Facebook  Subscribe to the VDOT RSS feed (Home Page)  Follow VDOT on Twitter   Visit the VDOT YouTube Channel