Recently Completed: Interstate 81 Exit 14 Interchange Improvements (Washington County)

Cost and schedule ►

Interstate 81 exit 14 reconstruction was completed in late October 2018.

The project included: reconstruction of I-81 before and after the interchange, replacement of the I-81 bridges over Route 647 (Old Jonesboro Road), reconstruction of the on and off ramps at Exit 14, reconstruction of Jonesboro Road to provide two through lanes in each direction with a raised median and dual left turn lanes for the I-81 northbound entrance ramp, installation of two traffic signals where I-81 ramps intersect with Jonesboro Road, and construction of a retaining wall between I-81 and a portion of Dennison Drive.

Benefits 

Project improves safety, better accommodates traffic volumes and replaces outdated I-81 bridges at the exit. 

Resources

Contact Info:

John Dew, P.E., Area Construction Engineer
276-696-3438

Major funding source: Federal Funds

Phase: Recently Completed

UPC: 97856

State ID: 0081-095-957,P101,R201,C501,B670,B671

Federal ID: IM-081-1(340)

Lat/Long: 36.693611, -82.012222

Locality: Washington