Map of construction project districts

Coming Soon

Advance Mills Bridge

Project Photos

Project at a Glance

District
Culpeper

Contact
Allan Sumpter
(434) 293-0011

About the Project

To receive updates about the project, send an e-mail to advancemills@vdot.virginia.gov.

This project will replace the one-lane, timber-deck truss bridge over the North Fork Rivanna River in northern Albemarle County.

The bridge is located in the village of Advance Mills just west of the intersection of Route 641 and Route 743. The existing bridge was closed in April 2007 due to its advanced deterioration.

The proposed replacement bridge will be a two-lane truss structure sufficient for all legal-load vehicles, improving access to the community for emergency vehicles as well as mobility for local residents and businesses.

The proposed design will resemble the existing bridge and will be context-sensitive to maintain the integrity of the Advance Mills Historic District.

The final design will be determined with consideration of the comments received during the public involvement process.

Public Hearing: Tuesday, July 8, 5 p.m. to 7 p.m., Best Western Charlottesville Airport Inn & Suites, 5920 Seminole Trail, Ruckersville.  

Cost: $3 million (preliminary estimate)

Project Schedule:

  • NEPA process complete – June 2008
  • Advertise for bids – January 2009
  • Bridge open to traffic – late fall 2009 to spring 2010

Links:



Contacts

Allan Sumpter, (434) 293-0011
Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects

Page last modified: Friday, June 06, 2008