In Design

Route 600, Fluvanna County

Intersection Improvements, Route 600 and Route 53

Project at a Glance

Begin Date
Scheduled 2012

Cost
$2.23 million (2011-1016 Six-Year Improvement Program estimate)

Lengths and Limits
0.27 mile; from 0.12 mile south of Route 600 to 0.15 mile north of Route 600

Locality
Fluvanna

District
Culpeper

Contact

Barry Jones
540-829-7554

Project Purpose

This project will improve the existing unsignalized "T" intersection of Route 600 (South Boston Road) and Route 53 (Thomas Jefferson Parkway) to improve safety and increase the efficiency of traffic movements through this intersection.

 

What is Proposed?

The project will realign Route 53 and replace the current "T" intersection with a roundabout. 

The approaches to the intersection on Route 53 will be shifted to the south to eliminate the current sharp curves and improve sight distances for vehicles approaching the intersection. 

VDOT evaluated several options to improve safety at the intersection, including installing a signal to control traffic. The analysis showed a roundabout would be the best solution.

Route 600 currently carries approximately 4,600 vehicles per day; Route 53 carries 6,400 vehicles per day.

 

Project Schedule

Design Public Hearing: April 28, 2010

Public Comment Ends: May 10, 2010

Right of Way Acquisition and Utility Relocation Begins: Spring 2011

Construction Begins: Fall 2012

 

Project Costs

The latest estimated project costs from the 2011-2016 Six-Year Improvement Program:

Total cost: $2,230,000

Design and Engineering: $500,000

Right of Way Acquisition and Utility Relocation: $220,000

Construction: $1,500,000

This project is in the early stage of development and the cost estimates are subject to change as the intersection improvement design is finalized. Estimates will be updated as the project progresses. This project will be financed using state and federal funds.

 

Project Information and News Releases

Public hearing set for Route 53 roundabout in Fluvanna (37 KB)

Public hearing brochure (1.9 MB)

Aerial rendering showing proposed improvements (927 KB)

 

 

 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Jan. 18, 2012

 


Connect With Us...
View VDOT photo galleries on Flickr Find VDOT on Facebook  Subscribe to the VDOT RSS feed (Home Page)  Follow VDOT on Twitter   Visit the VDOT YouTube Channel