I-95 Southbound Collector-Distributor Lanes − Rappahannock River Crossing

I-95 Southbound between Exit 130 (Route 3) and Exit 133 (Route 17)

Project at a Glance

Begin Date
2017

Est Completion Date
2022

Phase
Coming Soon

Cost
$125 million

Locality
Fredericksburg and Stafford

District
Fredericksburg

Contact
Krishna Potturi, VDOT MegaProjects Engineer
540-899-4288
Kelly Hannon, Communications Manager
540-374-3344

About the Project

The I-95 Rappahannock River Crossing Southbound project will add 2 collector-distributor lanes parallel to Interstate 95 southbound between Exit 133 (Route 17) in Stafford County and Exit 130 (Route 3) in the City of Fredericksburg.

A new I-95 southbound bridge will be built over the Rappahannock River to carry the new collector-distributor lanes. The new bridge will be built parallel to the existing I-95 southbound bridge at the Rappahannock River.

The project seeks to reduce I-95 congestion at Fredericksburg by providing local traffic with an additional route to travel between Route 17 and Route 3 without merging into the interstate's general purpose lanes.

The existing I-95 interchanges at Route 17 and Route 3 will also be modified, as well as ramps to the Safety Rest Area and Virginia Welcome Center.

This Smart Scale project is fully funded through construction in the FY2017-2022 Six-Year Improvement Program.

Design Public Hearing: January 25, 2017

The public is invited to attend a design public hearing on Wednesday, Jan. 25, 2017 to learn more about the I-95 Southbound Collector-Distributor Lanes − Rappahannock River Crossing project, and to comment on the proposed design.

The design public hearing will be held:

Wednesday, Jan. 25, 2017

5-7 p.m.

Fredericksburg Hospitality House & Conference Center

Madison and Monroe Rooms

2801 Plank Road (Central Park)

Fredericksburg, VA 22401

Inclement weather date: Wednesday, February 1, 2017

Stop by anytime between 5-7 p.m. to review displays, proposed plans, and discuss questions with Virginia Department of Transportation staff.

No formal presentation will be given at the public hearing.

Written and oral comments will be accepted at the public hearing, and afterward through Wednesday, Feb. 8, 2017.

Comments may also be submitted by mailing them to Mr. Krishna Potturi, VDOT Project Manager, 87 Deacon Road, Fredericksburg, VA 22405.

Comments may be emailed to Krishna Potturi at Krishna.Potturi@VDOT.Virginia.Gov.

Please reference “Rappahannock River Crossing Southbound public comment” in the email subject line.

Public Hearing Documents

Public Hearing Brochure

Display Board: North of Route 17

Display Board: Route 17 interchange area

Display Board: Rappahannock River Bridges area

Display Board: Safety Rest Area/Fall Hill Avenue area

Display Board: Route 3 interchange area

Typical Sections

Environmental Study Public Hearing: June 24, 2015

A public hearing on the findings of the project's environmental study was held on:

Wednesday, June 24, 2015

5-7 p.m. 

James Monroe High School 

2300 Washington Avenue

Fredericksburg, VA 22401

Meeting Brochure

Meeting Display Boards:

Welcome

Project History and Purpose and Need

Build Alternative

Traffic Volumes and Summary of Potential Environmental Impacts

Section 4(f) Resources

Public Comments and Next Steps

Environmental Study Documents

Draft Environmental Assessment

(Technical Reports)

Air Report

Architectural Management Summary

Natural Resources, Full Report

Natural Resources, Appendices Only

Natural Resources, Report Only

Noise Report

Phase I Phase II Cultural Resources Report

Interchange Modification Report (IMR)

Volume I

Appendices

Volume II (figures)

Graphics of Preferred Alternative

 