Under Construction
I-64 West and Hampton Roads Bridge-Tunnel East Repaving Project |
| Hampton |
Project at a Glance
Begin Date
Spring 2012
Cost
$2.5 million
Contractor
Basic Construction
Locality
Hampton
District
Hampton Roads
Spring 2012
Cost
$2.5 million
Contractor
Basic Construction
Locality
Hampton
District
Hampton Roads
Contact
Thomas A. Druhot, P.E., Project Manager
757-543-5367
About the Project:
Crews will repave all travel lane surfaces on I-64 West from the Hampton Roads Bridge-Tunnel (HRBT) to the Hampton Coliseum.
One phase of work will include the repaving of the eastbound tube of the Hampton Roads Bridge-Tunnel. Crews will repave these lanes after Labor Day 2012.
Other parts of the contract are to mill and repave I-64 West from the Hampton Roads Bridge-Tunnel to I-664 during weeknight single lane closures from Sunday through Thursday.