Project Overview

These are two concurrent projects designed to improve bicyclist and pedestrian safety along the project corridor by addressing deficiencies in lane and shoulder width and horizontal and vertical alignment. The project will begin at East Main Street (Route 789) and end on Route 13 Business in Accomack County, and for a length of approximately 2.87 miles on Pennsylvania Avenue (Route 609) in the town of Onley.  

Typical Section and Geometrics

Route 609 is classified as a rural major collector.  The plans are to widen the existing roadway in the town of Onley to include two, 11-foot travel lanes with three-foot accommodations for bicyclists and pedestrians, and curb and gutter. The roadway in the county will be widened to a 22-foot roadway with two, 11-foot travel lanes and six-foot shoulders, of which four feet will be paved to accommodate bicyclists and pedestrians.    
  
Project Update: The cost estimate is currently $9.3 million. This project is scheduled to go to advertisement in February 2015. Completion date is being recalculated due to a change in the original advertisement date.  

 

 

 

 

 