Project Details
The Route 620 project is a Full Depth Reclamation (FDR) road widening project that extends from Route 681 to Route 637. The procedure consists of milling the existing asphalt road, blending the millet with a select material, then placing this blend back onto the road bed, all in one process.
This asphalt blend will provide a favorable base to place a new course of asphalt. The existing road alignment will also be realigned and widened throughout the limits of the project area.
Current Status
Update: Due to periods of inclement weather, the schedule for construction has been extended for at least two weeks. Pending further delays, schedule is expected to conclude October 15, 2012. Motorists should continue to use posted detours until further notice.
Clearing and initial grading work began in June 2012 and is on-going. A temporary truck detour, detailed in the following section, will be in place through mid-October 2012.
Project Detours
Until construction is complete, cars and light truck drivers are advised to take the following detours. Semi-tractor trailers are not permitted on this particular detour.
From Route 460, traffic heading north on Route 620 towards Smithfield:
1. Turn right on Route 646
2. Turn left on Route 649
3. Turn left on Route 637
4. Turn right on Route 620
From Route 258, traffic heading south on Route 620 towards Ivor:
1. Turn left on Route 637
2. Turn right on Route 649
3. Turn right on Route 646
4. Turn left on Route 620
The tractor trailer detour is as follows:
From Route 460 east:
1. Follow Route 460 east to Windsor (Route 258)
2. Turn left on Route 258 north towards Smithfield
From Route 258 south:
1. Follow Route 258 south to Windsor (Route 460)
2. Turn right on Route 460 west towards Richmond