Background | Study documents | Schedule | Community Involvement | Publications
I-66 Inside the Beltway Feasibility Study
The Feasibility Study is too large to list a single downloadable file. For your convenience, we have separated the complete study into logical sections. Click the title of the file to begin the download. All files are PDF and require the free Adobe Reader to view them.
- Title Page and Table of Contents
- Chapter 1 - Overview (494 KB)
- Chapter 2 - Community Outreach Activities (171 KB)
- Chapter 3 - Assessment of the Corridor (1 MB)
- Chapter 4 - Problem Statement (86 KB)
- Chapter 5 - Concepts (938 KB)
- Chapter 6 - Technical Evaluation (2.3 MB)
- Chapter 7 - Recommended Actions (87 KB)
- Appendix A - Study Organization Chart (1.4 MB)
- Appendix B - I-66 Chronology (88 KB)
- Appendix C - Changes in the Coleman Decision (2.9 MB)
- Appendix D - Congressmen Frank R. Wolf and Thomas M. Davis Letter (1 MB)
- Appendix E - Governor Mark R. Warner Letter (673 KB)
- Appendix F - Commissioner Philip A. Shucet Letter (1.1 MB)
- Appendix G - Public Comments (344 KB)
- Appendix H - Telephone Survey (2.8 MB)
- Appendix I - Concepts and Solutions Display Boards (1.2 MB)
- Appendix J - Existing Right-of-Way (1.6 MB)
- Appendix K - Cross Sections Locations with Right-of-Way Constraints (2 MB)
- Appendix L - Locations of Right-of-Way Constraints (1.9 MB)
Page last modified: Monday, June 04, 2007






