In Design

Route 29, Main Street, Towns of Altavista & Hurt

Altavista Bridge

Project at a Glance

Begin Date
September 2018

Cost
$25.88 million

Lengths and Limits
From Route 43 to 00.38 miles south of Route 43; 0.3800 miles

Locality
Campbell

District
Lynchburg

Contact
Brian Casto, P.E.
434-856-8276

July 12 Design Public Hearing

Advertisement

Meeting brochure

Comment sheet

Display of typical section

Bridge plan and elevation display

Bridge section display

Bridge substructure display

Public Hearing display

 