Map of construction project districts

In Design

Route 643 Bridge Replacement, Campbell County

Project at a Glance

Locality
Campbell

District
Lynchburg

Contact
Laura Walton, Project Manager
434-947-6559 or 800-367-7623

December 2012 Design Public Hearing

The primary purpose of this project is to replace the existing bridge and approaches to improve roadway geometrics.   The new structure will be located immediately north of the existing structure allowing traffic to be maintained on existing alignment with a minimum of three months closure during construction.

Advertisement

Brochure

Comment Sheet

Location Map

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects