Place holder
Travel Center
Place holder
News
Place holder
Info Center
Place holder
Business Center
Place holder
Programs
Place holder
Projects
Place holder
About
Place holder
Jobs
Place holder
Sitemap
Place holder
Call 1-800-FOR-ROAD



Map of construction project districts

Studies

US 460/29 Corridor

Improving safety through access management

Project at a Glance

Est Completion Date
November 2009

Locality
Lynchburg

District
Lynchburg

Contact

Brian Casto, P. E.
434-856-8276

Citizen Information Meeting II - December 11, 2008

This meeting is being held to provide interested citizens an opportunity to informally review, discuss and provide input on several concepts to convert Route 460/29 to a limited access facility between Route 501 and the Route 29 Bypass that were developed from input received at the first citizen information meeting.

Due to current funding availability, the cost of completely reconstructing the corridor as studied in 2001 is not feasible.

Increased traffic volumes on this roadway have impacted safety.  VDOT is investigating ways in which roadway a  project or series of projects may be completed in a phased approach as funding becomes available and would result in Route 460/29 being a limited access facility.
 
All comments received, both oral and written, will be reviewed by VDOT personnel. Questions and concerns raised as a result of this meeting will be considered by VDOT in the development of future improvement concepts for this roadway corridor. A comment sheet is included and your oral or written comments and input are encouraged. Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects

Page last modified: Dec. 11, 2008

 


Connect With Us...
View VDOT photo galleries on Flickr Find VDOT on Facebook  Subscribe to the VDOT RSS feed (Home Page)  Follow VDOT on Twitter   Visit the VDOT YouTube Channel