Under Construction: I-66 at Route 28 in Fairfax County
Cost and schedule ►
Note: This project is being constructed as part of the Transform 66 Outside the Beltway Improvements.
The Six-Year Improvement Program approved by the Commonwealth Transportation Board in June 2014 provided $50 million to begin design, right of way and construction for Phase 1 improvements to the I-66 interchange at Route 28.
A preliminary study identified interchange alternatives, created a concept-level operational analysis, developed cost estimates and identified key implementation constraints.
Study results were shared with the community and stakeholders, and next steps included identifying funding.
The study considered:
- Traffic volumes at the year 2040
- Right-of-way impacts and property access issues for the Fairfax County Park Authority
- Braddock and Walney roads
- Community concerns
- Possible phasing opportunities
Benefits
This project aims to reduce congestion and associated air quality impacts, improve safety and operations and enhance bicycle and pedestrian accessibility.
Resources
UPC: 103317, 110197
State ID: 0066-029-016, P101
Federal ID: HSIP-066-1 (345)
Lat/Long: 38.846613, -77.432310
Locality:
Fairfax