Under Construction

Lee Road Widening

Extending the box culvert over Schneider Branch in Fairfax County

Project Photos

Project at a Glance

Begin Date
June 2, 2014

Est Completion Date
May 2015

Cost
Approx. $3.3 million

Contractor
Martin & Gass, Inc.

Locality
Fairfax

District
Northern Virginia

Contact
Oscar D. Jamilla, DPE, PMP
Sr. Construction Manager
703-259-2769
Chan B. Basnayake, P.E., PMP
Area Construction Engineer
703-259-2947

About the Project

This project will extend the box culvert and widen Lee Road (Route 661) over Schneider Branch in Fairfax County, and relieve congestion by eliminating an existing choke point. Construction began on June 2, 2014 and the estimated completion date is May 2015.

Estimated Cost
Preliminary engineering: $750,000
Right of way: $580,000
Construction: $2 million
Total: $3.3 million

Traffic Impacts

During construction, motorists can expect lane closures as follows:

• 9 a.m. to 3:30 p.m. - Monday through Friday
• All Day - Saturdays and Sundays

Drivers should expect alternating one-way traffic and temporary stoppages along Lee Road (both northbound and southbound) and Flint Lee Road. Flagger service will be in place during these lane closures and variable message boards may be placed as necessary to provide direction to the travelling public.

Resources

Environmental document (Programmatic Categorical Exclusion)

State Project: 0661-029-831   UPC: 92143