Under Construction
Route 50 Arlington Boulevard - Pedestrian Bridge |
Area Map
Project Photos
Project at a Glance
Begin Date
Ground breaking took place on Oct. 22, 2007.
Est Completion Date
November 7, 2008
Locality
Fairfax
District
Northern Virginia
Ground breaking took place on Oct. 22, 2007.
Est Completion Date
November 7, 2008
Locality
Fairfax
District
Northern Virginia
Contact
Mahmud M. Hussain, Resident Administrator,
703-383-2730
What's Being Done
Installation of a pedestrian bridge and fence on Route 50/Arlington Boulevard from 0.045 miles east of the Route 7 Overpass to 0.012 miles west of Patrick Henry Drive. The project length is .457 miles.Design Approval
Public Hearing Displays
Benefits
This bridge will provide a safe route for pedestrians walking between two shopping areas.
Project Updates
The Pedestrian Bridge has completed 92 % of the required construction items. Both the North and South ramps have been completed. The steel truss is being re-fabricated due to cracks found in the original truss that was delivered in July 2008. The black vinyl fence has been installed along east & west bound Route 50. The project is currently in suspension while waiting for the steel truss (to be delivered in early Spring 2009).Contacts
Mahmud M. Hussain, Resident Administrator,, 703-383-2730Page last modified: Dec. 16, 2008