Studies
Bi-County Parkway Location Study |
| A new north-south link connecting Manassas and the Dulles Corridor |
Join VDOT for an information meeting June 3 at the Hylton Performing Arts Center in Manassas to learn the facts and current status of the North-South Corridor Master Plan Study, the proposed Bi-County Parkway, improving access to the Western side of Dulles Airport, and the proposed Manassas National Battlefield Park Bypass. See the ad for details.
About the Study
In November 2005, the Commonwealth Transportation Board (CTB) approved the location for a new 10.4-mile north-south transportation link that would connect Manassas with the Dulles corridor.
The location of the new road would be north of Interstate 66, from the I-66 and Route 234 interchange to Route 50 in Loudoun County.
This is the West Two (CD) alternative analyzed in the draft environmental impact statement (DEIS).
600-foot Corridor Aerial-Based Map
(Source: 2007 Prince William & Loudoun County's parcel data)
The next steps in the process is the completion of the final environmental impact statement (FEIS), which:
- Documents the action of the CTB
- Responds to comments received on the DEIS
- Addresses measures to mitigate impacts
The FEIS is followed by a record of decision by the Federal Highway Administration. The FEIS is approved by the Federal Highway Administration and is expected to be completed in summer 2013.
- Study area map (The approved location is West Two Alternative)
- CTB resolution (Nov. 17, 2005)
- CTB presentation (Nov. 17, 2005)
- Modification of November 2005 CTB location approval (Feb. 20, 2013)
Draft Environmental Impact Statement and Technical Reports
PDFs ![]()
- Supplemental Archaeological Survey and Metal Detecting
September 2010 (5 MB) - Draft environmental impact statement (39 MB)
- Air quality technical report (1 MB)
- Alternatives identification and screening technical report (6 MB)
- Architectural survey May 2004 (4 MB)
- Cultural resources overview (11 MB)
- Architectural survey June 2004 (10 MB)
- Architectural evaluation January 2005 (10 MB)
- Capital cost estimate and methodology technical report (1 MB)
- Energy technical report (1 MB)
- Hazardous materials technical report (4 MB)
- Hydrology and hydraulics technical report (12 MB)
- Indirect effects and cumulative impacts technical report (3 MB)
- Logical termini memorandum (620 KB)
- Natural resources technical report (26 MB)
- Noise analysis technical report (6 MB)
- Purpose and need technical report (2 MB)
- Socioeconomic technical report (2 MB)
- Transportation and traffic technical report (8 MB)
- Water quality technical report (5 MB)
- Land use, farmlands and parklands technical report (3 MB)
- Evaluation of Sites 44PW0579 (VDHR# 076-0271-0062) and 44PW0623 and Dunklin Monument Avoidance Metal Detection Survey (7 MB)
- Archaeological Survey (10 MB)
