Wiehle Avenue and Center Harbor Road

Signal improvements in Reston

Project at a Glance

Begin Date
Fall 2013

Est Completion Date
April 28, 2014

Cost
$391,000 total

Locality
Fairfax

District
Northern Virginia

Contact
Zamir Mirza
703-259-1794

About the project

This project was completed on April 28, 2014. Two concrete ADA ramps damaged in snow removal efforts were removed and replaced on June 9, 2014.

The project upgraded the existing traffic signal at Wiehle Avenue (Route 828) and Center Harbor Road in Reston. 

The previous signal had poor visibility for oncoming vehicles, which caused conflicts for crossing vehicles and pedestrians and abrupt stops by the approaching vehicles. These conflicts created safety hazards for crossing vehicles and pedestrians and following vehicles. The purpose of this project was to upgrade the existing traffic signal with the objective of reducing right-angle, rear-end and pedestrian/bicyclist crashes.

About 14,000 vehicles per day use this intersection.

Estimated project costs
Preliminary engineering: $50,000
Right of way and utilities: $69,000
Construction: $272,000
Total: $391,000
 

State Project: 0828-029-921, P101, R201, M501  UPC: 98283