Recently Completed: Nash Road (Route 636) Bridge Replacement
Cost and schedule ►
Public outreach ►
The project, completed in August 2019, replaced the aging Route 636 bridge over the Rita Branch Creek with a new structure on the existing alignment. The former structure was built in 1951 and was substandard to handle future traffic volumes.
Benefits
Project improvements included a wider bridge with the weight restriction removed.
Resources
Robert Poutier
804-892-5076
Phase: Complete
UPC: 103469
State ID: 0636-020-653, P101, R201, C501, B694
Federal ID: STP-5A27(235)
Lat/Long: 37.299518, -77.564339
Locality:
Chesterfield