What is being proposed?

The primary purpose of this project is to replace the two Interstate 81 bridges over Route 8 that are nearing the end of their service life.

To replace these bridges, it is anticipated that mainline I-81 would be realigned, the exit 114 ramps adjusted and the grade changed at the bridges approaches.  Currently, no major improvements to Route 8 are planned as part of this project.

During preliminary design of the proposed bridges over Route 8, concepts for potential future modifications of the interchange were considered. These included teardrop roundabout diamond, diverging diamond and conventional diamond interchanges.

This project is fully funded.

Project Timeline

VDOT anticipates advertising the bridge replacements as a design-build project in fall 2017.  Total cost is estimated at $34.9 million.

Design Public Hearing
The Virginia Department of Transportation held a design public hearing on September 15, 2016.  

Click here to see the public hearing brochure.

Click here to see the project display.

Traffic Impacts

Temporary lane closures, traffic shifts and road detours may be necessary during construction. Depending on the final design of the project, the estimated construction duration could be 42-48 months. Access to all properties would be maintained during construction.