Under Construction
City of Waynesboro - Route 340 (Delphine Avenue) |
Project at a Glance
Awarded on January 9, 2012
Est Completion Date
August 2013
Cost
Contract value is $4,897,253.35
Lengths and Limits
Length: 0.3849 mile From: 0.078 km north of CSXT Railroad To: "B" Street
Contractor
Fielder’s Choice Enterprises Inc. of Charlottesville, Va.
Locality
Augusta
District
Staunton
Contact
Wayne Nolde, P.E.
540-332-9047
Project Details
This project will widen Route 340 to four lanes with sidewalk curb and gutter between Main Street and the CSTX railroad and CSTX railroad and “B” Street. It is Phase II and III of an original design to upgrade the roadway between two existing four lane facilities. Phase I of the original project was constructed in 2009 and included replacing a narrow railroad bridge and improving the adjacent roadway to a four lane facility.
Phase I of the project also included purchasing the right of way required for the remaining phases.
Phase II includes upgrading the existing facility from a two to four lanes with a center turn lane between Main Street and the previously constructed Phase I project at the CSTX Railroad. Phase III will upgrade the existing facility to a four lane facility from the CSTX Rail Road to “B” Street. The proposed four lane facility will have four 11-foot lanes, a 13 foot center turn-lane, and five-foot sidewalks on both sides of the road.
Traffic Alerts
Traffic alerts can also be found on the VDOT website under Travel Center, Travel advisories and lane closures. Click on the area of the state you are interested in, and view current travel advisories and lane closures. Click here to go to the Staunton District Travel Center page: Staunton District
Real-time traffic information is available on the VDOT 511Virginia.org website and also by calling 511 on your landline or wireless phone. Click here to go to 511: Virginia 511 Web
Project Numbers
State 0340-136-326,P101, R201, C501
Federal STP-5136 (127); STP-5136 (126)
UPC 87504 87505