Harrisonburg Southeast Connector |
Project at a Glance
Begin Date
Spring 2004
Est Completion Date
Completed December 2007
Lengths and Limits
Candidate Build Alternative (CBA) 4 begins at Route 726 (Stone Spring) near the City of Harrisonburg and ends at Route 33. The length of the corridor is about 3.1 miles. Approved portion of CBA 1 begins at the Bridgewater Route 257/682 interchange with I-81 (Exit 240) and ends at Route 276. The length of this corridor is about 3.8 miles.
District
Staunton
Spring 2004
Est Completion Date
Completed December 2007
Lengths and Limits
Candidate Build Alternative (CBA) 4 begins at Route 726 (Stone Spring) near the City of Harrisonburg and ends at Route 33. The length of the corridor is about 3.1 miles. Approved portion of CBA 1 begins at the Bridgewater Route 257/682 interchange with I-81 (Exit 240) and ends at Route 276. The length of this corridor is about 3.8 miles.
District
Staunton
Contact
What's Being Done
The study is complete.
Project Updates
- The Federal Highway Administration (FHWA) issued Record of Decision (ROD), Dec. 21, 2007.
- Final Environmental Impact Statement (FEIS) as signed by FHWA, Oct. 18, 2007.
- Commonwealth Transportation Board (CTB) resolution selecting CBA (CBA) 4 and portion of CBA 1, Nov. 16, 2006.
Preferred Alignment Selected
Findings from the Draft Environmental Impact Statement (DEIS) and input from the public hearing, local government, as well as comments received on the DEIS were presented to the CTB for their consideration during their November 16, 2006 meeting. On this date the CTB approved CBA 4 and a portion of CBA 1 as the location of the Harrisonburg Southeast Connector.