Under Construction
Route 644 (Resort Drive) - Massanutten Resort Entrance |
Project at a Glance
Begin Date
Spring 2007
Est Completion Date
Summer 2008
Cost
$5,449,037.55
Contractor
General Excavation Inc. of Warrenton, Va.
Locality
Rockingham
District
Staunton
Spring 2007
Est Completion Date
Summer 2008
Cost
$5,449,037.55
Contractor
General Excavation Inc. of Warrenton, Va.
Locality
Rockingham
District
Staunton
Contact
Ben Lineberry or Don Komara
(540) 434-2586
Project Details
The project includes reconstruction and widening two miles of the existing roadway on Route 644, which is the main entrance to Massanutten Resort.The project extends from 0.017 mile north of Route 33 to 2.021 mile north of Route 1330 (Woodstone Meadows). Route 644 from Route 33 to Route 646 (Bloomer Springs Road) will be widened to four lanes for approximately 1 mile, and from Route 646 (Bloomer Springs Road) to Route 1330 (Woodstone Meadows) Route 644 will be two lanes. Each lane will be widened to 12 feet.
Contacts
Ben Lineberry or Don Komara, (540) 434-2586Page last modified: Friday, May 02, 2008