Warren County - Route 658 (Rockland Road)

Project at a Glance

Begin Date
CTB awarded contract on December 8, 2010.

Est Completion Date
June 1, 2012

Cost
Contract value is $2,487,177.33

Lengths and Limits
0.53-mile long; From: Intersection of Route 340/522 To: 0.53-mile east of Route 340/522

Contractor
Perry Engineering Co. Inc. of Winchester

Locality
Warren

District
Staunton

Contact
Robert Good, P.E.
540-778-2569

Project Details

The project will realign Route 658 (Rockland Road) across from Route 627 (Reliance Road) and install turn lanes and a signal. A circular cul-de-sac will be constructed at the end of the existing Route 658 intersection with Route 340/522.  

This project will improve traffic flow from the Kelly Industrial Park by relocating Route.658 across from Route 627.

The new intersection will be built 690 feet south of the existing intersection of Route 658 and Route 340/522.

Route 658 will have two 12-foot westbound lanes with a 16-foot raised median and a single 12-foot eastbound lane. The two westbound lanes and grass median will taper to a 4-foot raised grass median.  A single 12-foot eastbound lane with a left turn lane will tie Route 658 to a short connector road.

The connector road consists of two 12-foot travel lanes with four-foot shoulders and extends to existing Route 658 across from the DuPont entrance.

Benefits of Project

This project will improve traffic flow from the Kelly Industrial Park by relocating Route.658 across from Route 627.

During Construction

Be alert for lane closures and flagger traffic control.