Recently Completed

City of Waynesboro - Railroad Bridge Replacement

Project at a Glance

Est Completion Date
Fixed completion date is November 7, 2011

Cost
$9,862,043.45

Contractor
Abernathy Construction Corp., Glen Allen

Locality
Waynesboro

District
Staunton

Contact

Railroad Bridge Replacement Project in Waynesboro

Replace the existing CSXT bridge over Route 340 (North Delphine Avenue) and providing limited work on Route 340 to allow for a future four-lane roadway. This project is related to a separate project to widen Route 340 to four lanes from East Main Street to B Street.

 

Bridge Move November 17, 2009

With the assistance of four cranes the old railroad bridge was moved on November 17 at the North Delphine Avenue (Route 340) bridge project in the Waynesboro area.  In its place a new bridge was placed with the four cranes.  The work was a planned 24-hour operation to close the bridge and replace it before the railroad reopened the track to train traffic.

On site were representatives from Abernathy Construction Corp. of Glen Allen who is the project prime contractor, the Virginia Department of Transportation and Buckingham Branch Railroad.

The work began in the pre-dawn hours with the removal of two smaller spans located next to the main bridge deck.  Also concrete work was done to close two back walls of the abutments.  Demolition of the old abutments and backfilling behind the existing new abutments had to occur prior to setting the new deck on the bridge supports.  Once the bridge deck was in place then the railroad ballast structure and approaches were placed along with ties and rail and ending with track alignment.

The North Delphine Avenue project Route 340 allows for a future four-lane roadway. This project is related to a separate project to widen Route 340 to four lanes from East Main Street to B Street.  The entire North Delphine Avenue project includes the bridge construction. In addition this work also involves construction of a large portion of the new Delphine Avenue roadway between Sixth Street and Seventh Street, including storm drainage, retaining wall and utilities.

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Oct. 27, 2010

 


Connect With Us...
View VDOT photo galleries on Flickr Find VDOT on Facebook  Subscribe to the VDOT RSS feed (Home Page)  Follow VDOT on Twitter   Visit the VDOT YouTube Channel