Click an image to enlarge or to open documents.

Installing sidewalk in front of Christopher Newport University

Project view from the center of J. Clyde Morris Boulevard

Crews paving new lanes in front of Christopher Newport
University
![]()
Intersection construction
.![]()
Paving connecting Warwick Boulevard![]()
Construction by the 711 on Warwick Boulevard

Paver sidewalk installation crossing the J. Clyde Morris
Boulevard intersection

Levels of asphalt at the Christopher Newport University
intersection

Paving work down Warwick Boulevard

Replacing the old with the new by Riverside Hospital
![]()
Storm water installation by Christopher Newport University
![]()
Paving side street connected to Warwick Boulevard
![]()
Underground utilities near Nettles Drive
![]()
Underground storm water management system
![]()
Construction on Avenue
of the Arts near Warwick
Boulevard