Construction Scheduling
Construction Home | Advertisement | Bid Letting | Bid Tabulations | Construction Engineering and Inspection | Construction Quality Improvement Program | Construction Management | Construction Risk Management | Construction Scheduling | Document Sales | Emergency Contracts | Information, Memos, & Letters | Online Forms | Local Administered Projects | Prequalification | Resources | Specifications | Value Engineering | Email Us
- Contract Time Determination (CTD) Scheduling
- CD-2007-11 (Contract Time Determination CD) (PDF)
- FHWA CTD Guidelines (PDF)
- VDOT CTD Guidelines (PDF)
- VDOT CTD Bar-chart Template (Excel) 6/27/18
- VDOT Production Rates (Excel spreadsheet) 7/13/18
- Other DOT Production Rate Averages (Excel)
- Duralator (Excel) - update 8/25/2020
- Post-award Construction Scheduling
- VDOT Post-award Scheduling Guide
- VDOT Primavera P6 Schedule Scrubber - ZIP (9/29/20)
- Guidelines for Using the VDOT Primavera P6 Scrubber Tool
- Project Category (PDF) (revised May 31, 2012)
- Cat M Special Provision for Schedule of Operations (PDF)
- Cat I Special Provision for Progress Schedule (PDF)
- Cat II Special Provision for Progress Schedule (PDF)
- Cat III Special Provision for Progress Schedule (PDF)
- Cat IV Special Provision for Progress Schedule (PDF)
- Cat V Special Provision for Progress Schedule [Draft] (PDF)
- Design-Build Special Provision for Project Schedule (Exhibit 11.1)
- Guidelines for Conducting a Scheduling Conference (PDF)
- VDOT P6 Standard Bid Item Resources (ver.7.0.xer)
- Form C-13C Contractor’s Progress Earnings Schedule (XLSM - spreadsheet) - update 1/11/18
- Guidelines for preparing the VDOT Form C-13C (PDF)
- Form C-13CPM Contractor’s Progress Earnings Schedule (Excel) - updated 9/6/18
- Guidelines for preparing the VDOT Form C-13CPM (PDF) - 9/25/2019
- Primavera (P6) Activity Cost-loading Report (ACR) (P6 ACR Report File)
- Primavera P6 Monthly Progress Earnings Schedule Data Export Report (Form C-13CPM By Calendar Month)
- Primavera P6 Monthly Progress Schedule Data Export Report (Form C-13CPM By Estimate Dates) - 9/2018
- Microsoft MSCOMCT2 zip file 5/8/2019
- Guidelines for Installing and Registering MSCOMCT2 rev. 6/6/2019
- As-Built Schedule Tracker Zip File (New 1/16/2020)
- Guidelines for Using the As-Built Schedule Tracker (2/28/20)
- As-built Schedule Tracker Primavera P6 Layout File(1/23/20)
- Citrix Receiver 4.12 (2/21/20)
- Receiver Cleaner Utility (2/21/20)
- VDOT-VT Partnership for Project Scheduling
- Construction Scheduling MBTP Training Overview
- A Review of State DOT Methods for Determining Contract Times
- Analysis of VDOT Contract Values and Times
- Dura-Lator: A Project Duration Calculator
- Management Principles of Scheduling
- A Review of the Operational and Contract Administration Implications of Schedule Response
- Schedule Submittal Requirements
- Schedule Impact Analysis Using CPM Schedules
- Management Principles of Schedule Impact Analysis
- Development of an Intellectual Framework for Schedule Control
- Required Performance Method of Schedule Control
- Implementing Change in a Public Agency: Applying a Process to Produce Change in VDOT
- Contract Time Determination Guidelines
- Tracking Project Commodities for Progress Control
- Other Construction Scheduling Reference Materials and Websites