Design-Build Request for Qualifications (RFQs)
The current Requests for Qualifications (RFQs) are listed with a short description and the due date. Statements of Qualifications must be received by the date and time according to the selected RFQ.
Review the criteria prior to submittal to ensure that your firm receives equal consideration in the evaluation. For more information on the RFQ process, see the individual RFQ.
I-64 and I-464 Interchange Exit 291 Ramp Improvements
Description: The Project is located in the City of Chesapeake, Virginia. The Project will provide a direct connection between I-64 eastbound and Route 168 southbound via I-464 southbound. The project includes these improvements: new flyover ramp from I-64 eastbound to I-464 southbound (to Route 168), reconfiguration of I-64 eastbound ramp to I-464 northbound, maintain existing I-464 northbound to I-64 eastbound loop-ramp, maintain existing I-64 eastbound to I-464 southbound loop-ramp (to Rte. 17 southbound), and will shift the I-464 southbound diverge point for Rte. 17 and Rte. 168 approximately 2000ft. to the north. The proposed project objectives include improving traffic operations, reducing congestion, and improving safety.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and/or Bridge
- Environmental
- Geotechnical
- Hydraulics
- Traffic control devices
- Transportation Management Plan
- Right-of-way
- Utilities
- Public involvement/relations
- Quality assurance and quality control
- Intelligent Transportation Systems
- Landscaping
- Lighting
- Construction engineering and inspection
- Overall Project management
RFQ and submittal requirements can be found on Bid Express (bidexpress.com). The procurement files can be found using the Contract ID# C00120375DB118. Bid Express Information is provided below.
Bid Express Information
Deadline: May 24, 2023 (4:00 PM prevailing local time).
Project Information Meeting: A Project Information Meeting is scheduled for April 17, 2023 at the VDOT Hampton Roads District Office beginning at 10:00 AM. Details of the meeting are provided in the RFQ.
I-64 GAP Segment A Widening
Description: The project is located in New Kent County – 10.7 miles along I-64 between approximate Mile Marker (MM) 204.9 and MM 215.6. The two (2) existing EB and WB general purpose lanes will be widened on the median side to three (3) lanes in each direction. The purpose of this project is to improve traffic operations and safety, provide faster travel times, reduce congestion, and provide a more reliable system of travel in the I-64 corridor.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and/or Bridge
- Environmental
- Geotechnical
- Hydraulic and stormwater management
- Traffic control devices
- Transportation Management Plan
- Right-of-way
- Utilities
- Public involvement/relations
- Signage and lighting
- Quality assurance and quality control
- Intelligent Transportation Systems
- Soundwalls
- Construction engineering and inspection
- Overall Project management
Copies of the RFQ and additional submittal requirements can be found on Bid Express (bidexpress.com). The procurement files can be found using the Contract ID# C00122166DB119. Additional Bid Express Information is provided below.
RFQ Addendum #2, dated January 12, 2023 posted on Bid Express (bidexpress.com)
Deadline: January 26, 2022 (4:00 PM prevailing local time).
Project Information Meeting: VDOT will hold a virtual Project Information Meeting for Potential Offerors on Wednesday, December 21, 2022 at 9 AM. Details of the meeting are as follows:
Link for the virtual Project Information Meeting: https://covaconf.webex.com/covaconf/j.php?MTID=m887df340dfafac7ffc113d379b0b8fa6
OR
Join using following dial in information:
Join by phone: +1-517-466-2023 US Toll; +1-866-692-4530 US Toll Free
Access Code: 2435 571 3543
Bid Express Information
I-81 Widening MM 221 to MM 225
Description: The project consists of widening Interstate 81 to add one lane in each direction adjacent to the City of Staunton. The project has differing lengths NB and SB, with the SB limits extending further south to avoid negative operational/safety impacts of dropping the new lane between the closely-spaced Rt. 250 (Exit 222) and I-64 (Exit 221) interchanges. The overall project termini would be from MM 221.45 to MM 225.6 for a project length of 4.18 miles. Widening will occur primarily towards the median, though limited work to the outside will be necessary for shoulder strengthening (maintenance of traffic) and upgrading guardrail to current standards. Five bridges will be widened/rehabilitated with the project: Mainline SB bridges over I-64 Ramp 1, Augusta Woods Drive/Buckingham Branch Railroad, Route 250 and Lewis Creek, as well as the NB bridge over Lewis Creek.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulic and Stormwater Management
- Traffic Control Devices
- Transportation Management Plan
- Soundwalls
- Right of Way
- Utilities
- Public Involvement/Public Relations
- Sign structures, lighting, variable message boards and cameras
- Railroad coordination
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: August 17, 2022 (4:00 PM prevailing local time).
Project Information Meeting: A virtual Project Information Meeting is scheduled on July 8, 2022 at 10:00 am. Details of the meeting are provided in the RFQ.
PDFs
Request for Qualifications - Addendum No. 1
RFQ Attachment 2.10 - Form C-78-RFQ - Addendum No. 1
RFQ Questions and Answers - August 3, 2022
Project Information Meeting Presentation - July 8, 2022
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
Transportation Improvements at Hydraulic Road and US 29 Design-Build Project
Description: This project is located in the City of Charlottesville and Albemarle County. The project consists of five elements: 1) a grade separated pedestrian bridge over US 29 with bus stops and shelters near Zan Road, 2) a signalized pedestrian crossing and reconfigured traffic movements at the Hydraulic Road and US 29 intersection to eliminate left turns from Hydraulic Road to US 29, 3) intersection improvements to Angus Road & US 29 (green tee), 4) intersection improvements to Hillsdale Drive & Hydraulic Road (roundabout), and 5) access management improvements at the Hydraulic Road/Brandywine Drive & Hydraulic Road/Michie Drive intersections.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway (including Traffic Analysis)
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics
- Traffic Control Devices
- Transportation Management Plan
- Right of Way
- Utilities
- Public Involvement/Relations
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: June 7, 2022 (4:00 PM prevailing local time).
Project Information Meeting: A virtual Project Information Meeting is scheduled on April 27, 2022 at 10:00 am. Details of the meeting are provided in the RFQ.
PDFs
Request for Qualifications - Addendum No. 1
RFQ Attachment 2.10 - Form C-78-RFQ - Addendum No. 1
RFQ Questions and Answers - May 11, 2022
RFQ Information Meeting Presentation
RFQ Attachment 2.10 - Form C-78-RFQ
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package - Addendum No. 1
I-95 and Route 123 (Exit 160) Interchange Improvements
Description: The I-95 and Route 123 Interchange (Exit 160) in Prince William County will be modified in order to provide operational and safety improvements, capacity improvements, and pedestrian connectivity. The “Strategically Targeted Affordable Roadway Solutions” (STARS) study resulted in the development of a concept that includes replacing the northbound Route 123 to southbound I-95 loop ramp with a signalized left-turn movement west of I-95, modification to the Route 123 and I-95 Express Lane intersection, widening of the Route 123 to southbound I-95 on-ramp to two lanes, relocation of the southbound I-95 to northbound Route 123 off-ramp, the addition of a shared-use path parallel to northbound Route 123 from Annapolis Way to Devil’s Reach Road, and the deck repair/replacement of the I-95 southbound bridge over Occoquan Road.
Furnish Statement of Qualifications (SOQ) to support the design and const0uction of the Project to include, but not be limited to, the following:
- Roadway, including alternatives development
- Supplemental survey and uility test pits
- Structure and/or bridge
- Environmental, including NEPA Document support
- Geotechnical
- Hydraulics
- Traffic engineering
- Intelligent Transportation Systems
- Transportation Management Plan
- Right-of-way
- Utilities
- Public involvement/stakeholder coordination
- Quality Assurance and Quality Control
- Construction engineering and inspection
- Project controls
- Overall project management
Deadline: May 27, 2022 (4:00 PM prevailing local time).
Project Information Meeting: VDOT will hold a virtual Project Information Meeting for potential Offerors on the date and time set forth in the RFQ.
PDFs
Request for Qualifications - Addendum No. 1
RFQ Attachment 2.10 - Form C-78-RFQ - Addendum No. 1
RFQ Questions and Answers - May 5, 2022
RFQ Information Meeting Presentation
RFQ Attachment 1.1 – OPCC Process
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
Word
RFQ Attachment 3.1.2 – SOQ Checklist - Addendum No. 1
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table - Addendum No. 1
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
I-64 Hampton Roads Express Lanes (HREL) Segment 1A Design-Build Project
Description: This project is located in the City of Norfolk. The scope includes repurposing EB and WB I-64 from 0.150 miles East of Patrol Road (MM 276.2) to 0.663 miles East of Tidewater Drive (MM 277.6). The three existing EB and WB general purpose lanes and shoulders will be converted into one high occupancy express managed part time shoulder lane, and three general purpose (GP) lanes. This will provide an express lane option for both directions of I-64 in the reversible toll lane section. The eastern end of the project will connect to three general purpose lanes. The western end of the project will connect to a typical section with two high occupancy express lanes and two general purpose lanes. The proposed improvements include rehabilitation of the existing shoulders in each direction.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics
- Traffic Control Devices
- Transportation Management Plan
- Right of Way
- Utilities
- Public Involvement/Relations
- Quality Assurance and Quality Control
- Intelligent Transportation Systems
- Signage and Lighting
- Construction Engineering and Inspection
- Overall Project Management
Deadline: March 3, 2022 (4:00 PM prevailing local time).
Project Information Meeting: A virtual Project Information Meeting is scheduled for on January 27, 2022 at 1.30 pm. Details of the meeting are provided in the RFQ.
PDFs
RFQ Questions and Answers, February 11, 2022
RFQ Addendum No. 1, February 10, 2022
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 1
RFQ Attachment 2.10 - Form C-78-RFQ
Project Information Meeting Presentation
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package 1 of 2
RFQ Information Package 2 of 2
Route 29 Widening Phase II
Description: The Project, located in Fairfax County, Virginia, will widen Route 29 (Lee Highway) from four lanes to six lanes from 0.006 mile west of Union Mill Road to 0.160 mile east of Buckleys’ Gate Drive for approximately 1.48 miles. The Project includes adding and improving shared-use paths along both sides of Route 29, from 0.208 mile west of Union Mill Road to 0.460 mile east of Buckley’s Gate Drive (approximately 2.14 miles) to provide better bicyclist and pedestrian access to the trails at the Fairfax County Parkway/West Ox Road interchange. Crosswalks at major intersections and modified signals to accommodate these new facilities, and a new frontage road are also included in the Project. The proposed project objectives include improving capacity, vertical alignment, pedestrian connectivity, safety at conflict points, and drainage facilities along Route 29.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Environmental
- Geotechnical
- Hydraulics and Stormwater Management
- Traffic Control Devices
- Transportation Management Plan
- Right of Way
- Utilities
- Public Involvement/Relations and Stakeholder Coordination
- Quality Assurance and Quality Control
- Intelligent Transportation Systems
- Landscaping
- Lighting
- Construction Engineering and Inspection
- Overall Project Management
Deadline: September 2, 2021 (4:00 PM prevailing local time).
Project Information Meeting: There will be no project information meeting. A presentation will be posted on this website.
PDFs
RFQ Questions and Answers - August 11, 2021
RFQ Attachment 2.10 - Form C-78-RFQ
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
Project Information Presentation
RFQ Information Package – July 27,2021
I-64 Hampton Roads Express Lanes (HREL) Segment 4C Design-Build Project
Description: The project is located in the City of Hampton. The scope includes widening Eastbound (EB) and Westbound (WB) I-64 from 0.138 miles East of LaSalle Ave (MM265.5) to 0.500 miles East of Settlers Landing Rd (MM267.8). The three (3) existing EB and WB general purpose lanes will be converted into two (2) managed lanes, and two (2) general purpose (GP) lanes in each direction. This will extend the full roadway section of the HRBT Expansion project to the west for 2.4 miles. The western end of the project will connect to a typical section with one (1) managed lane and two (2) GP lanes. The proposed improvements include rehabilitation of the existing lanes and an additional 12’ wide travel lane in each direction.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics
- Soundwalls
- Right of Way
- Utilities
- Public Involvement/Relations
- Sign Structures
- Intelligent Transportation Systems
- Railroad
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: June 29, 2021 (4:00 PM. prevailing local time).
Project Information Meeting: A virtual Project Information Meeting is scheduled for on May 7, 2021 at 10.30 am. Details of the meeting are provided in the RFQ.
PDFs
RFQ Questions and Answers - June 21, 2021
RFQ Addendum No. 2 - June 11, 2021
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 2
RFQ Addendum No. 1 - June 2, 2021
Project Information Meeting Presentation
Request for Qualifications - April 30, 2021
RFQ Attachment 2.10 - Form C-78-RFQ
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package – April 30, 2021 (1 of 2)
RFQ Information Package – April 30, 2021 (2 of 2)
I-95 City of Richmond Bridge Superstructure Replacement and Rehabilitation Bundling
Description: The Project, located in the City of Richmond, Virginia, includes superstructure replacement and substructure rehabilitation of five structurally deficient bridges over I-95: 1st Street Bridge, 4th Street Bridge, 5th Street Bridge, 7th Street Bridge, and Broad Street (Rte. 250) Bridge. The proposed Project will replace the bridge superstructures, not only to eliminate the structural deficiencies, but also to increase the vertical clearance to a minimum of 15 feet at each bridge. The width and length of the bridges will not be increased as part of this project. Substructure rehabilitation/repair will be performed on these structures.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Structure and Bridge
- Survey
- Environmental
- Geotechnical
- Hydraulics and Stormwater Management
- Traffic Control Devices (including overhead sign structures)
- Transportation Management Plan
- Right of Way
- Utilities
- Public Involvement/Relations and Stakeholder Coordination
- Quality Assurance and Quality Control
- Intelligent Transportation Systems
- Lighting
- Construction Engineering and Inspection
- Overall Project Management
Deadline: February 2, 2021 (4:00 PM. prevailing local time).
Project Information Meeting: There will be no project information meeting. A presentation is posted below.
PDFs
RFQ Questions and Answers, January 12, 2021
Request for Qualifications - December 15, 2020
Project Information Presentation
RFQ Attachment 2.10 - Form C-78-RFQ
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package – December 15, 2020
Boundary Channel Drive at I-395 Interchange
Description: The Project, located in Arlington County, Virginia, will reduce Boundary Channel Drive from four lanes to two lanes, and the two interchange ramp terminals on Boundary Channel Drive will be converted to roundabouts. Proposed improvements along Boundary Channel Drive are from 0.06 miles west of the Connector Road and to Long Bridge Drive for approximately 0.4 miles. The Project includes a sidewalk along the eastbound side of Boundary Channel Drive and a shared-use path along the westbound side, with a trail connection that ties to the Mount Vernon Trail within National Park service (NPS) property. The project objectives include operational and safety improvements along I-395, Boundary Channel Drive, and Long Bridge Drive.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Environmental
- Geotechnical
- Hydraulics and Stormwater Management
- Traffic Control Devices (including overhead sign structures)
- Transportation Management Plan
- Right of Way (including limited access line changes)
- Utilities
- Public Involvement/Relations and Stakeholder Coordination
- Quality Assurance and Quality Control
- Intelligent Transportation Systems
- Landscaping
- Lighting
- Construction Engineering and Inspection
- Overall Project Management
Deadline: December 8, 2020 (4:00 PM. prevailing local time).
Project Information Meeting: There will be no project information meeting. A presentation is posted below.
Note: Addendum No. 3 includes four CADD files related to test hole survey information which were omitted from the RFQ Information Package.
PDFs
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 3
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 2
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 1
RFQ Questions and Answers, November 17, 2020
Project Information Presentation
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package – Addendum No. 3 – December 1, 2020
RFQ Information Package – October 21, 2020
I-81 Widening MM 136.6 to MM 141.8 (Design-Build Project)
Description: The project is located along I-81 in Roanoke County and City of Salem. The project adds a third lane on Northbound and Southbound I-81 beginning south of exit 137 and ending north of exit 141, along with improvements to the southbound exit ramp at the exit 137 interchange. Project improvements include but are not limited to: an additional lane in both northbound and southbound directions including associated improvements; two bridges replaced over Wildwood Road (Route 112 – exit 137); two bridges replaced over Goodwin Avenue (Route 635); two bridges replaced over Wildwood Road (Route 619, noting that I-81 crosses Wildwood Road two times); two bridges widened at Thompson Memorial Drive (Route 311- exit 140).
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics and Stormwater Management
- Traffic Control Devices
- Transporatation Management Plan
- Soundwalls
- Right of Way
- Utilities
- Public Involvement/Public Relations
- Sign Structures, Lighting, Variable Message Boards and Cameras
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: July 8, 2020 (4 p.m. prevailing local time).
Project Information Meeting: There will be no project information meeting. A presentation is posted below.
PDFs
RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 1
RFQ Questions and Answers, June 18, 2020
Project Information Presentation
Request for Qualifications (RFQ)
RFQ Attachment 3.2.7(a) - Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) - Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 - Sample SOQ Score Sheet
Word
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Bid Express Information
Zip Files
RFQ Information Package - May 29, 2020 (1 of 2)
RFQ Information Package - May 29, 2020 (2 of 2)
I-95 NB Rappahannock River Crossing (Design-Build)
Description: The project is located along I-95 between mile markers 129 and 136 in Spotsylvania County, City of Fredericksburg, and Stafford County. The project will add parallel collector-distributor lanes on Northbound I-95 beginning south of Exit 130 and ending north of Exit 133, along with interchange modifications at Exit 133 and an auxiliary lane from the tie-in north of Exit 133 to the beginning of the existing northbound off-ramp at Exit 136. The primary scope of works include but is not limited to: three additional northbound CD lanes; new bridge over the Rappahannock River; Route 17 interchange modifications; and an auxiliary lane extension from CD Lanes to Exit 136.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics
- Soundwalls
- Traffic Control Devices/ITS
- Transportation Management Plan
- Right of Way
- Utilities
- Sign Structures
- Public Involvement/Outreach
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: July 02, 2019 (4 p.m. prevailing local time).
Project Information Meeting: A project information meeting will be held on Monday, May 20, 2019 for potential Offerors at the Virginia Department of Transportation’s Fredericksburg Residency at 86 Deacon Road Fredericksburg, VA 22405 at 1:30 PM (prevailing local time).
Project Site Visit: VDOT has arranged for a Project Site visit under the supervision of VDOT representatives on June 7, 2019 between the approximate hours of 9:30 AM and 11:00 AM. Investigative devices and equipment are not allowed. One vehicle per Offeror’s team will be permitted. Interested Offerors are required to submit the names of attendees by June 5, 2019 to the VDOT Point of Contact, Suril R. Shah (Suril.shah@vdot.virginia.gov).
The site visit will begin from Fredericksburg District Auditorium Parking lot at 9.30 AM and will tentatively follow the below plan. All personnel are required to bring their own Personal Protective Equipment.
9:30 AM – Leave from Fredericksburg District Auditorium Parking
9:45 AM – Reach Rappahannock River under the I-95 NB Bridge
10:15 AM – Leave the River
10:30 AM – Stop in the median of I-95
10:50 AM – Leave the median of I-95
11:00 AM – End of Site Visit
PDFs
RFQ Questions and Answers, dated June 6, 2019
Project Information Meeting Presentation
Project Information Meeting Attendance List
Request for Qualifications (RFQ)
RFQ Attachment 2.8 – Information Package Order Form
RFQ Attachment 2.10 - Form C-78 RFQ
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 – Sample SOQ Score Sheet
Word
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer
Skiffes Creek Connector
Description: The project is located in James City County, Virginia. The purpose of this project is to create efficient local connectivity between Route 60 (Pocahontas Trail) and Route 143 (Merrimac Trail), in the area between Route 199 and Route 238, in a manner that improves safety, emergency evacuation, and the movement of goods along the two primary roadways. The Project involves construction of a new two-lane roadway, and includes a bridge at Skiffes Creek, a bridge over CSX Transportation Railroad, and intersection improvements at the two termini. The Project also includes a multi-use path along eastbound Route 60 from intersection with Green Mount Parkway (Route 774) to the existing bus stop/proposed bus shelter.
Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:
- Roadway
- Survey
- Structure and Bridge
- Environmental
- Geotechnical
- Hydraulics and Stormwater Management
- Traffic Control Devices
- Transporatation Management Plan
- Right of Way
- Utilities
- Railroad Coordination
- Public Involvement/Outreach
- Quality Assurance and Quality Control
- Construction Engineering and Inspection
- Overall Project Management
Deadline: May 30, 2019 (4 p.m. prevailing local time).
Project Information Meeting: A project information meeting will be held on March 6, 2019 for potential Offerors at the Virginia Department of Transportation’s Hampton Roads District Office at 7511 Burbage Drive, Suffolk, Virginia 23435 in the James River Conference Room at 10:00 AM (prevailing local time).
VDOT is granting permission to access a portion of the Skiffes Creek Connector Project for any firm to conduct a geotechnical investigation during the procurement phase of the Project. Please see pdf below titled "Skiffes Creek Connector - Geotechnical Investigation Description" for specific details and requirements.
PDFs
Skiffes Creek Connector - Geotechnical Investigation Description
RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 2
RFQ Addendum No.1
RFQ Questions and Answers, revised April 30, 2019
Project Information Presentation
Project Information Meeting Attendance List
Request for Qualifications (RFQ)
RFQ Attachment 2.8 – Information Package Order Form
RFQ Attachment 3.1.2 – SOQ Checklist
Word
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor