Design-Build Request for Qualifications (RFQs)

The current Requests for Qualifications (RFQs) are listed with a short description and the due date. Statements of Qualifications must be received by the date and time according to the selected RFQ.

Review the criteria prior to submittal to ensure that your firm receives equal consideration in the evaluation. For more information on the RFQ process, see the individual RFQ.

Monitor this page for updates

Route 29 Widening Phase II 

Description: The Project, located in Fairfax County, Virginia, will widen Route 29 (Lee Highway) from four lanes to six lanes from 0.006 mile west of Union Mill Road to 0.160 mile east of Buckleys’ Gate Drive for approximately 1.48 miles.  The Project includes adding and improving shared-use paths along both sides of Route 29, from 0.208 mile west of Union Mill Road to 0.460 mile east of Buckley’s Gate Drive (approximately 2.14 miles) to provide better bicyclist and pedestrian access to the trails at the Fairfax County Parkway/West Ox Road interchange.  Crosswalks at major intersections and modified signals to accommodate these new facilities, and a new frontage road are also included in the Project.  The proposed project objectives include improving capacity, vertical alignment, pedestrian connectivity, safety at conflict points, and drainage facilities along Route 29.

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Environmental
  • Geotechnical
  • Hydraulics and Stormwater Management
  • Traffic Control Devices
  • Transportation Management Plan
  • Right of Way
  • Utilities
  • Public Involvement/Relations and Stakeholder Coordination
  • Quality Assurance and Quality Control
  • Intelligent Transportation Systems
  • Landscaping
  • Lighting
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  September 2,  2021 (4:00 PM prevailing local time).

Project Information Meeting:  There will be no project information meeting.  A presentation will be posted on this website.

PDFs pdfs 

RFQ Questions and Answers - August 11, 2021 

Request for Qualifications

RFQ Attachment 2.10 - Form C-78-RFQ

RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 – Sample SOQ Score Sheet


Word Word

RFQ Attachment 3.1.2 – SOQ Checklist 
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer 

Bid Express Information

Account Registration

Frequently Asked Questions

User Guide

Vendor Set-Up Guide

Zip Files 

Project Information Presentation

RFQ Information Package  – July 27,2021

I-64 Hampton Roads Express Lanes (HREL) Segment 4C Design-Build Project  

Description: The project is located in the City of Hampton. The scope includes widening Eastbound (EB) and Westbound (WB) I-64 from 0.138 miles East of LaSalle Ave (MM265.5) to 0.500 miles East of Settlers Landing Rd (MM267.8). The three (3) existing EB and WB general purpose lanes will be converted into two (2) managed lanes, and two (2) general purpose (GP) lanes in each direction. This will extend the full roadway section of the HRBT Expansion project to the west for 2.4 miles. The western end of the project will connect to a typical section with one (1) managed lane and two (2) GP lanes. The proposed improvements include rehabilitation of the existing lanes and an additional 12’ wide travel lane in each direction.

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and Bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Soundwalls
  • Right of Way
  • Utilities
  • Public Involvement/Relations
  • Sign Structures
  • Intelligent Transportation Systems
  • Railroad
  • Quality Assurance and Quality Control
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  June 29, 2021 (4:00 PM. prevailing local time).

Project Information Meeting:  A virtual Project Information Meeting is scheduled for on May 7, 2021 at 10.30 am. Details of the meeting are provided in the RFQ.

PDFs pdfs 

RFQ Questions and Answers - June 21, 2021 

RFQ Addendum No. 2 - June 11, 2021

RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 2  

RFQ Addendum No. 1 - June 2, 2021 

Project Information Meeting Presentation 

Request for Qualifications - April 30, 2021

RFQ Attachment 2.10 - Form C-78-RFQ

RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 – Sample SOQ Score Sheet


Word Word

RFQ Attachment 3.1.2 – SOQ Checklist 
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer 

Bid Express Information

Account Registration

Frequently Asked Questions

User Guide

Vendor Set-Up Guide

Zip Files 

RFQ Information Package  – April 30, 2021 (1 of 2)
RFQ Information Package  – April 30, 2021 (2 of 2)

I-95 City of Richmond Bridge Superstructure Replacement and Rehabilitation Bundling  

Description: The Project, located in the City of Richmond, Virginia, includes superstructure replacement and substructure rehabilitation of five structurally deficient bridges over I-95: 1st Street Bridge, 4th Street Bridge, 5th Street Bridge, 7th Street Bridge, and Broad Street (Rte. 250) Bridge.  The proposed Project will replace the bridge superstructures, not only to eliminate the structural deficiencies, but also to increase the vertical clearance to a minimum of 15 feet at each bridge.  The width and length of the bridges will not be increased as part of this project. Substructure rehabilitation/repair will be performed on these structures.

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Structure and Bridge
  • Survey
  • Environmental
  • Geotechnical
  • Hydraulics and Stormwater Management
  • Traffic Control Devices (including overhead sign structures)
  • Transportation Management Plan
  • Right of Way
  • Utilities
  • Public Involvement/Relations and Stakeholder Coordination
  • Quality Assurance and Quality Control
  • Intelligent Transportation Systems
  • Lighting
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  February 2, 2021 (4:00 PM. prevailing local time).

Project Information Meeting:  There will be no project information meeting.  A presentation is posted below. 

PDFs pdfs 

RFQ Questions and Answers, January 12, 2021

Request for Qualifications - December 15, 2020  

Project Information Presentation

RFQ Attachment 2.10 - Form C-78-RFQ

RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 – Sample SOQ Score Sheet


Word Word

RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer 

Bid Express Information

Account Registration

Frequently Asked Questions

User Guide

Vendor Set-Up Guide

Zip Files 

RFQ Information Package – December 15, 2020

Boundary Channel Drive at I-395 Interchange 

Description: The Project, located in Arlington County, Virginia, will reduce Boundary Channel Drive from four lanes to two lanes, and the two interchange ramp terminals on Boundary Channel Drive will be converted to roundabouts.  Proposed improvements along Boundary Channel Drive are from 0.06 miles west of the Connector Road and to Long Bridge Drive for approximately 0.4 miles.  The Project includes a sidewalk along the eastbound side of Boundary Channel Drive and a shared-use path along the westbound side, with a trail connection that ties to the Mount Vernon Trail within National Park service (NPS) property.  The project objectives include operational and safety improvements along I-395, Boundary Channel Drive, and Long Bridge Drive.

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Environmental
  • Geotechnical
  • Hydraulics and Stormwater Management
  • Traffic Control Devices (including overhead sign structures)
  • Transportation Management Plan
  • Right of Way (including limited access line changes)
  • Utilities
  • Public Involvement/Relations and Stakeholder Coordination
  • Quality Assurance and Quality Control
  • Intelligent Transportation Systems
  • Landscaping
  • Lighting
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  December 8, 2020 (4:00 PM. prevailing local time).

Project Information Meeting:  There will be no project information meeting.  A presentation is posted below.

Note: Addendum No. 3 includes four CADD files related to test hole survey information which were omitted from the RFQ Information Package.   

PDFs pdfs 

RFQ Addendum No. 3 

RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 3 

RFQ Addendum No. 2 

RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 2 

RFQ Addendum No. 1 

RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 1

RFQ Questions and Answers, November 17, 2020 

Project Information Presentation   
RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 – Sample SOQ Score Sheet


Word Word

RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer 

Bid Express Information

Account Registration

Frequently Asked Questions

User Guide

Vendor Set-Up Guide

Zip Files 

RFQ Information Package – Addendum No. 3 – December 1, 2020
RFQ Information Package – October 21, 2020

I-81 Widening MM 136.6 to MM 141.8 (Design-Build Project)

Description: The project is located along I-81 in Roanoke County and City of Salem. The project adds a third lane on Northbound and Southbound I-81 beginning south of exit 137 and ending north of exit 141, along with improvements to the southbound exit ramp at the exit 137 interchange.  Project improvements include but are not limited to: an additional lane in both northbound and southbound directions including associated improvements; two bridges replaced over Wildwood Road (Route 112 – exit 137); two bridges replaced over Goodwin Avenue (Route 635); two bridges replaced over Wildwood Road (Route 619, noting that I-81 crosses Wildwood Road two times); two bridges widened at Thompson Memorial Drive (Route 311- exit 140).

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and Bridge
  • Environmental
  • Geotechnical
  • Hydraulics and Stormwater Management
  • Traffic Control Devices
  • Transporatation Management Plan
  • Soundwalls
  • Right of Way
  • Utilities
  • Public Involvement/Public Relations
  • Sign Structures, Lighting, Variable Message Boards and Cameras
  • Quality Assurance and Quality Control
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  July 8, 2020 (4 p.m. prevailing local time).

Project Information Meeting:  There will be no project information meeting.  A presentation is posted below.

PDFs pdfs

RFQ Addendum No.1 

RFQ Attachment 2.10 - Form C-78-RFQ Addendum No. 1 

RFQ Questions and Answers, June 18, 2020 

Project Information Presentation 

Request for Qualifications (RFQ)

RFQ Attachment 3.2.7(a) - Certification Regarding Debarment Primary Covered Transactions

RFQ Attachment 3.2.7(b) - Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 - Sample SOQ Score Sheet

Word Word

RFQ Attachment 3.1.2 – SOQ Checklist

RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies

RFQ Attachment 3.2.10 – SCC and DPOR Information Table

RFQ Attachment 3.3.1 – Key Personnel Resume Form

RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor

RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer

Bid Express Information

Account Registration

Frequently Asked Questions

User Guide

Vendor Set-Up Guide

Zip Files 

RFQ Information Package - May 29, 2020 (1 of 2)

RFQ Information Package - May 29, 2020 (2 of 2)

I-95 NB Rappahannock River Crossing (Design-Build)   

Description: The project is located along I-95 between mile markers 129 and 136 in Spotsylvania County, City of Fredericksburg, and Stafford County.  The project will add parallel collector-distributor lanes on Northbound I-95 beginning south of Exit 130 and ending north of Exit 133, along with interchange modifications at Exit 133 and an auxiliary lane from the tie-in north of Exit 133 to the beginning of the existing northbound off-ramp at Exit 136. The primary scope of works include but is not limited to: three additional northbound CD lanes; new bridge over the Rappahannock River; Route 17 interchange modifications; and an auxiliary lane extension from CD Lanes to Exit 136.  

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and Bridge
  • Environmental
  • Geotechnical
  • Hydraulics
  • Soundwalls
  • Traffic Control Devices/ITS
  • Transportation Management Plan
  • Right of Way
  • Utilities
  • Sign Structures
  • Public Involvement/Outreach
  • Quality Assurance and Quality Control
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  July 02, 2019 (4 p.m. prevailing local time).  

Project Information Meeting:  A project information meeting will be held on Monday, May 20, 2019 for potential Offerors at the Virginia Department of Transportation’s Fredericksburg Residency at 86 Deacon Road Fredericksburg, VA 22405 at 1:30 PM (prevailing local time).

Project Site Visit:  VDOT has arranged for a Project Site visit under the supervision of VDOT representatives on June 7, 2019 between the approximate hours of 9:30 AM and 11:00 AM. Investigative devices and equipment are not allowed. One vehicle per Offeror’s team will be permitted. Interested Offerors are required to submit the names of attendees by June 5, 2019 to the VDOT Point of Contact, Suril R. Shah (Suril.shah@vdot.virginia.gov). 

The site visit will begin from Fredericksburg District Auditorium Parking lot at 9.30 AM and will tentatively follow the below plan. All personnel are required to bring their own Personal Protective Equipment.

9:30 AM – Leave from Fredericksburg District Auditorium Parking

9:45 AM – Reach Rappahannock River under the I-95 NB Bridge

10:15 AM – Leave the River

10:30 AM – Stop in the median of I-95

10:50 AM – Leave the median of I-95

11:00 AM  End of Site Visit

PDFs pdfs 

RFQ Questions and Answers, dated June 6, 2019  

Project Information Meeting Presentation   
Project Information Meeting Attendance List 

Request for Qualifications (RFQ)

RFQ Attachment 2.8 – Information Package Order Form

RFQ Attachment 2.10 - Form C-78 RFQ
RFQ Attachment 3.1.2 – SOQ Checklist

RFQ Attachment 3.2.7(a) – Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) – Certification Regarding Debarment Lower Tier Covered Transactions

RFQ Attachment 4.1.2 – Sample SOQ Score Sheet

Word Word

RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer

 

Skiffes Creek Connector  

Description: The project is located in James City County, Virginia.  The purpose of this project is to create efficient local connectivity between Route 60 (Pocahontas Trail) and Route 143 (Merrimac Trail), in the area between Route 199 and Route 238, in a manner that improves safety, emergency evacuation, and the movement of goods along the two primary roadways.  The Project involves construction of a new two-lane roadway, and includes a bridge at Skiffes Creek, a bridge over CSX Transportation Railroad, and intersection improvements at the two termini.  The Project also includes a multi-use path along eastbound Route 60 from intersection with Green Mount Parkway (Route 774) to the existing bus stop/proposed bus shelter. 

Furnish Statement of Qualifications to support the design and construction of the Project to include, but not be limited to, the following:

  • Roadway
  • Survey
  • Structure and Bridge
  • Environmental
  • Geotechnical
  • Hydraulics and Stormwater Management
  • Traffic Control Devices
  • Transporatation Management Plan
  • Right of Way
  • Utilities
  • Railroad Coordination
  • Public Involvement/Outreach
  • Quality Assurance and Quality Control
  • Construction Engineering and Inspection
  • Overall Project Management

Deadline:  May 30, 2019 (4 p.m. prevailing local time).  

Project Information Meeting:  A project information meeting will be held on March 6, 2019 for potential Offerors at the Virginia Department of Transportation’s Hampton Roads District Office at 7511 Burbage Drive, Suffolk, Virginia 23435 in the James River Conference Room at 10:00 AM (prevailing local time).

VDOT is granting permission to access a portion of the Skiffes Creek Connector Project for any firm to conduct a geotechnical investigation during the procurement phase of the Project. Please see pdf below titled "Skiffes Creek Connector - Geotechnical Investigation Description" for specific details and requirements. 

PDFs pdfs

Skiffes Creek Connector - Geotechnical Investigation Description 

RFQ Addendum No. 2  

RFQ Attachment 2.10 - Form C-78 RFQ - Addendum No. 2

RFQ Addendum No.1
RFQ Questions and Answers, revised April 30, 2019

Project Information Presentation  
Project Information Meeting Attendance List  

Request for Qualifications (RFQ)

RFQ Attachment 2.8 – Information Package Order Form
RFQ Attachment 3.1.2 – SOQ Checklist
RFQ Attachment 3.2.7(a) –  Certification Regarding Debarment Primary Covered Transactions
RFQ Attachment 3.2.7(b) –  Certification Regarding Debarment Lower Tier Covered Transactions
RFQ Attachment 4.1.2 –  Sample SOQ Score Sheet

Word Word

RFQ Attachment 3.2.6 – Affiliated and Subsidiary Companies
RFQ Attachment 3.2.10 – SCC and DPOR Information Table
RFQ Attachment 3.3.1 – Key Personnel Resume Form
RFQ Attachment 3.4.1(a) – Work History Form – Lead Contractor
RFQ Attachment 3.4.1(b) – Work History Form – Lead Designer 

 

 

Page last modified: Sept. 3, 2021