Recently Completed: Interstate 81 Frontage Road Study (Washington County)
Cost and schedule ►
Take a survey ►
The Interstate 81 Frontage Road Study, finalized in April 2020, evaluated the feasibility of addressing gaps in the current roadway network that could provide a secondary road system, parallel to a segment of the I-81 corridor from exit 7 at Old Airport Road to exit 22 at Route 704 (Enterprise Road) and parallel to U.S. Route 11 in Washington County, Va.
Final Report: Interstate 81 Exit 7 to Exit 22 Frontage Road Corridor Study
Study displays shown at the May 2019 information meeting:
Study Area 1: between exits 7 and 10
Study Area 2: between exits 10 and 13
Study Area 3: between exits 13 and 14
Study Area 4: between exits 14 and 17
Study Area 5: between exits 17 and 19
Study Area 6: between exits 19 and 22
Benefits
The frontage road system concept would provide an alternate route for local traffic to travel between Bristol and Abingdon. It could potentially reduce local traffic demand on the interstate and provide a more resilient roadway network capable of supporting traffic diverted from I-81 during an incident.
The study will serve as a planning tool for the Washington County Board of Supervisors and the Abingdon Town Council, helping them to make informed decisions when selecting and prioritizing potential projects for SMART SCALE applications. SMART SCALE is a VDOT program where localities apply for funds and their applications are scored statewide based on an objective, outcome-based process.
Major Milestones
Information meetings were held in February and May 2019 to show preliminary information regarding the study.