
Culpeper Projects (Sorted by Locality)
Sort by status | Sort by locality
Albemarle
2022 Culpeper District Paving & ResurfacingAlbemarle Co. Design-Build Projects (6)
I-64 at exit 118 interchange improvements, I-64 at exit 124 diverging diamond interchange, Fontaine Avenue exit ramp improvements, Route 250/151 roundabout, Route 20/649/1494 roundabout, Rio Mills connector roadHydraulic Road and U.S. 29 Transportation Improvements
Transportation ImprovementsInterstate 64 Afton Mountain Safety Improvements
Installation of queue detection warning system and upgraded lighting at exit 99Interstate 64 Bridge Maintenance, Albemarle County
Rehabilitating bridges over Route 20 and Route 29Route 240 (Crozet Avenue), Albemarle County
Rehabilitation of bridge over Lickinghole CreekRoute 240/250/680 Roundabout, Albemarle County
Construction of roundaboutRoute 250 (Ivy Road) Corridor Improvement Study, Albemarle County
Route 601 (Old Ivy Road), Albemarle County
Replacement of bridge over Route 29/250 BypassRoute 631 (5th Street/Old Lynchburg Road) Corridor, Charlottesville & Albemarle
Fifth Street Corridor StudyRoute 667 (Catterton Road), Albemarle County
Replacement of bridge of Piney CreekRoute 702 (Fontaine Avenue Extended), Albemarle County
Replacement of bridge of Morey CreekRoute 726 (James River Road), Albemarle County
Replacement of bridge over Totier CreekU.S. 29 Corridor Study, Albemarle and Greene counties
Charlottesville
Hillsdale Drive South
An extension of Hillsdale Drive south from Hydraulic RoadHydraulic Road and U.S. 29 Transportation Improvements
Transportation ImprovementsRoute 29/Hydraulic Road Intersection
Improvements to the intersection of Route 29 and Hydraulic Road in Charlottesville
Culpeper
2022 Culpeper District Paving & ResurfacingBrandy Station Park and Ride, Culpeper County
Expansion of park and ride lotBusiness Route 15 (Remington Road), Culpeper County
Rehabilitation of bridge over Rappahannock RiverRoute 29 at Route 718, Culpeper Co.
Construction of a restricted crossing U-turn intersectionRoute 3-McDevitt Drive Roundabout
Intersection improvement at Route 3 (Fredericksburg Road) & Route 799 (McDevitt Drive)Waterloo Bridge, Culpeper Co./Fauquier Co.
Rehabilitation of the Route 613 (Waterloo Road) bridge over the Rappahannock River
Fauquier
2022 Culpeper District Paving & ResurfacingBroadview Avenue, Town of Warrenton
Installation of median from Route 211 to south of Route 17 and intersection improvementsRoute 15/17/29 Warrenton Interchange, Fauquier County
Construction of grade-separated interchange at Rt. 15/17/29 (Eastern Bypass), Rt. 15/17/29 Business and Rt. 880 (Lord Fairfax Drive.)Route 17 (Marsh Road), Fauquier County
Rehabilitation of southbound bridge over Norfolk Southern Railway and Route 805 (Bealeton Road)Route 29 at Vint Hill Road, Fauquier County
Safety improvements on Rt. 29 south of the Rt. 215 (Vint Hill Rd.) intersectionRoute 602 (Rogues Road), Fauquier County
Reconstruction of roadway near Academic AvenueRoute 647 (Crest Hill Road), Fauquier County
Replacement of bridge over Thumb RunRoute 651 (Sumerduck Road), Fauquier County
Replacement of 2 bridge superstructures on Route 651U.S. 17 (Winchester Rd.) at Rt. 245 (Old Tavern Rd.)/Rt. 703 (Enon Church Rd.), Fauquier Co.
Intersection Study, Fauquier Co.U.S. 29-Vint Hill Rd. Intersection Improvements
Dual left-turn lanes from SB U.S. 29 to Route 215, Fauquier CountyWarrenton Park and Ride, Fauquier County
Expansion of park and ride lotWaterloo Bridge, Culpeper Co./Fauquier Co.
Rehabilitation of the Route 613 (Waterloo Road) bridge over the Rappahannock River
Fluvanna
2022 Culpeper District Paving & ResurfacingRoute 53 and Route 618, Fluvanna County
Construction of roundaboutRoute 629 (Deep Creek Road), Fluvanna County
Replacement of Bridge over Middle Fork Kent BranchZion Crossroads Corridor Improvement Study (Routes 15 and 250), Fluvanna & Louisa Counties
Greene
2022 Culpeper District Paving & ResurfacingRoute 670 Connector Road, Greene County
Construction of road to connect Route 29 and Route 670 (Preddy Creek Road)U.S. 29 Corridor Study, Albemarle and Greene counties
U.S. 33 at U.S. 29, Greene County
Improvements at the intersection of U.S. 33 and U.S. 29 in Ruckersville
Louisa
2022 Culpeper District Paving & ResurfacingI-64 Interchange at Route 15, Zion Crossroads
Construction of diverging diamond interchange (DDI)Louisa - Roundabout at Broad Street Road (Route 250) and Cross County Road (Route 522)
Project to improve safety and traffic flow at intersectionRoute 522 and Route 208, Louisa County
Construction of roundaboutRoute 767 (School Bus Road), Louisa County
Relocation of School Bus Road to align with Chalklevel RoadZion Crossroads Corridor Improvement Study (Routes 15 and 250), Fluvanna & Louisa Counties
Madison
2022 Culpeper District Paving & ResurfacingRoute 29 at Route 662 (Shelby Road), Madison County
Construction of a restricted crossing U-turn intersection
Orange
2022 Culpeper District Paving & ResurfacingBarboursville Roundabout
Roundabout at U.S. 33-Route 20 intersectionRoute 20 at Route 231, Orange County
Construction of roundaboutRoute 601 (Flat Run Road), Orange County
Safety improvementsRoute 635 (Greenwood Road), Orange County
Replacement of bridge over Norfolk Southern Railroad
Rappahannock
2022 Culpeper District Paving & Resurfacing