In Design: Compton Road Shared-Use Path in Fairfax County

Cost and schedule ►

Public outreach ►

Dec. 9 Virtual Public Information Meeting Info

Please note: A virtual public information meeting will be held Thursday, Dec. 9 (in case an alternate date is needed, the meeting will be held Monday, Jan. 10) at 7 p.m., read more in the ad.

This project will construct a ten-foot-wide shared-use path along northbound Compton Road (Route 658) from the Bull Run Special Events Center Access Road to just south of the I-66 bridge, and from just north of the I-66 bridge to a connection with the existing Cub Run Trail. The project also includes widening the Compton Road bridge over Cub Run to accommodate the new shared-use path. The portion of the shared-use path under the I-66 bridge is being constructed separately as part of the Transform 66 Outside the Beltway Project.

Estimated Costs
Preliminary Engineering - $750,000
Right of Way Acquisition and Utility Relocation - $450,000
Construction - $3.3 million
Total - $4.5 million

This project is financed with federal, state and Fairfax County funding.

Benefits 

This project aims to improve bicyclist and pedestrian safety, accessibility and connectivity to the Cub Run Trail system.

Major Milestones 

Virtual Public Information Meeting - Dec. 9, 2021
Virtual Public Information Meeting Comment Deadline - Dec. 20, 2021
Begin Right of Way Acquisition - Winter 2022/2023
Begin Construction - Spring 2024

Resources

Contact Info:

Hong "Jenny" Ha, P.E.
Location & Design
703-259-2907

Andrew Beacher, P.E.
Preliminary Engineering
703-259-2239

Other relevant links:

Virtual Public Information Meeting Ad and
Meeting Details - Dec. 9, 2021

Right of Way and Utilities Webpage

Major funding source: Fairfax County

Phase: In Design

UPC: 115604

State ID: 0658-029-461, B652, C501, P101, R201

Federal ID: CMAQ-5B01 (106)

Lat/Long: 38.821031, -77.465777

Locality: Fairfax