Proposed: Route 50 Corridor Improvements in Fairfax and Loudoun Counties
This project will make safety and operational improvements at several locations along a six-mile stretch of Route 50 (John S. Mosby Highway) between Gum Spring Road (Route 659) and Centreville Road (Route 657).
The improvements include:
- Replacing the northbound Gum Spring Road right turn lanes at Route 50 with a free-flow right turn lane and a new eastbound Route 50 merge lane from Gum Spring Road to Hutchinson Farm Drive
- Extending the westbound Route 50 left turn lanes at Gum Spring Road
- Extending the eastbound Route 50 left turn lane at Loudoun County Parkway
- Converting a westbound left turn lane at Pleasant Valley Road (Loudoun) to an auxiliary through lane running to Tall Cedars Parkway
- Improving traffic signal timing and the intersection layout at Avion Parkway
- Improving traffic signal equipment and timing at Centreville Road
Route 50 averages up to 71,000 vehicles a day within the project limits.
Estimated Costs
Preliminary Engineering: $1.3 million
Construction: $9.4 million
Total: $10.7 million
The project is financed with federal, state (including Smart Scale), Loudoun County and Northern Virginia Transportation Authority funding.
Benefits
The project aims to relieve congestion and improve safety and operations.
Major Milestones
Begin Preliminary Engineering: Early 2020
Begin Construction: 2023
Resources
Khalid Gandhi, P.E.
Location & Design
Kimberly McCool, P.E.
Preliminary Engineering (Loudoun)
Andrew Beacher, P.E.
Preliminary Engineering (Fairfax)
Phase: Proposed
UPC: 114827, 114828
State ID: 0050-053-211, P101; 0050-M10-010, P101
Federal ID: HIP-5B01 (043); HIP-5B01 (042)
Lat/Long: 38.911217, -77.473252
Locality:
Fairfax
and
Loudoun