Under Construction: Hanover - Beaver Dam Road (Route 715) Bridge Replacement over Newfound River

Cost and schedule ►


Traffic alerts ►

Public outreach ►

The purpose of the project is to replace the bridge over Newfound River. The existing structure was constructed in 1959.

Benefits 

The project will provide drivers in the area with a newly constructed bridge to replace the current, structurally deficient bridge.

Resources

Contact Info:

Marcos Kocolis
804-585-3583

Project Photos

Other relevant links:

Project news release

Phase: Under construction

UPC: 109988

State ID: 0715-042-825,B645, M501, P101, R201

Lat/Long: 37.847806, -77.690346

Locality: Hanover

x2close
1 / 1
list of Photos
Detour route for Beaver Dam Road in Hanover

Page last modified: May 10, 2021